3. INSTALLATION AND COMMISSIONING
3.1 General
Requirements for installation are:
- a stable surface that is a burden of at least ± 3000 kg can carry
- the machine must be set up in such a way that there is sufficient space to carry out control
and/or repair work
- the machine can be picked up by a forklift, which is certainly a burden of ± can carry 1500 kg.
3.2 Commissioning
For the first use after a major overhaul, repair or long-term storage, machine should be
recommissioned.
Check:
-
Whether all parts and accessories are present
-
Whether all moving parts can run freely
-
Correct direction of rotation and connection of the motors
-
Damage, especially external electrical wiring
-
The correct operation of all mechanical control devices
-
The correct settings corresponding to the type of product to be processed
-
Whether all hydraulic connections still be in tact
Warning!
The risks of improper functioning are greater than normal during business counting. Take
additional safety measures where necessary.
Afbeelding 3.1.1
Heftruckbeugels