Federal Signal Corporation Vista XAPK-SC Скачать руководство пользователя страница 2

2   

Vista Model XAPK-SC, -SD or XPK-SC, -SD Permanent Mount Kit

Table 1: Kit contents (continued)

Qty. Description

Part No.

Qty. Description

Part No.

4

Nut, Jam, 1/4-20

7057A049

2

Foot, Mounting, Left

8583084

4

Nut, Hex, 3/8-16

7059A063

2

Foot, Mounting, Right 8583085

4

Lockwasher, Split, 3/8

7074A046

2

Screw, Set, #8-32

7008A012-05

8

Lockwasher, Split, 5/16

7074A020-01

2

Stop, Mounting Bolt

8583126

8

Washer, Flat, 5/16

7072234

8

Screw, Hex Hd., #10

7011A135-10

NOTE: For electrical installation instructions, refer to the

 Installation and Maintenance Instructions

 

included with the Vista lightbar.

Preparing the Lightbar for Installation

1.   Turn the lightbar assembly over so that the bottom of the lightbar faces up. To avoid marring 

the plastic domes, place the lightbar on soft rags or cardboard.

290A4113-01

HEX JAM NUTS 1/4-20 (4)

ACORN NUTS 1/4-20 (4)

TOGGLE BOLTS 1/4-20 x 2" (4)

MOUNTING PADS (4)

5/16" SPLIT 

LOCKWASHERS (8)

5/16” FLAT
WASHERS

(8)

BOLT, 5/16-18 x 5/8"
SLTD.TORX PAN HEAD (8)

MOUNTING FOOT, BRACKET (4)

SCREW, HEX HEAD, 
#10, TYPE B (8)

BOLT, CARRIAGE (4)

A

B

C

Figure 1: Exploded view of mounting foot hardware 

2.  Use the 5/16-18 x 5/8 Torx head bolts, 5/16 flat washers, and 5/16 lockwashers to secure a 

mounting foot on the mounting bracket: 

a.  Position the Torx head bolts at the bottom of the slots as shown in 

Figure 1.

 

b.  Tighten the bolts only enough to hold the mounting foot in place.

3.  Repeat step with the other mounting bracket.

4.  Install the rubber mounting pads in the mounting feet as shown in 

Figure 1.

NOTE FOR MODEL XAPK-SC: The mounting bracket is factory-mounted on the lightbar for 

Model XAPK-SC. Do not perform steps 5 through 8 for this model. Proceed to the next section  

Preparing the Mounting Surface 

to complete the installation.

Содержание Vista XAPK-SC

Страница 1: ...light system to ensure that it is operating properly and that it is securely attached to the vehicle Refer to the instruction sheets included with related products for additional precautions and info...

Страница 2: ...s or cardboard 290A4113 01 HEX JAM NUTS 1 4 20 4 ACORN NUTS 1 4 20 4 TOGGLE BOLTS 1 4 20 x 2 4 MOUNTING PADS 4 5 16 SPLIT LOCKWASHERS 8 5 16 FLAT WASHERS 8 BOLT 5 16 18 x 5 8 SLTD TORX PAN HEAD 8 MOUN...

Страница 3: ...as shown in Figure 1 Tighten the nuts only enough to hold the mounting bracket assembly in place Repeat this step with the other mounting bracket assembly 290A4114 01 MOUNTING PAD MOUNTINGFOOT 5 16 18...

Страница 4: ...installed in step 7 of Preparing the Lightbar for Installation Place the lightbar assembly on the vehicle roof in the previously determined position THESE DISTANCES SHOULD BE EQUAL VEHICLE ROOF VISTA...

Страница 5: ...h Friday CT or contact your nearest distributor Returning a Product to Federal Signal Before returning a product to Federal Signal call 800 264 3578 800 433 9132 or 800 824 0254 to obtain a Returned M...

Страница 6: ...K SC SD or XPK SC SD Permanent Mount Kit blank page Send all material with the issued RMA Number to Federal Signal Corporation 2645 Federal Signal Drive University Park IL 60466 Attn Service Departmen...

Страница 7: ...2645 Federal Signal Drive University Park IL 60484 3176 Tel 800 264 3578 Fax 800 682 8022 www fedsig com 2009 Federal Signal Corporation...

Отзывы: