
Installation and Maintenance Instructions
Model G-LED Global Series LED Beacon
15
J1
GND
GND
+ -
+ -
120-240VAC Models
To wire the Ex d VAC flameproof beacon:
a. See Figure 7 on page 15. Connect the line (hot) power source wire
to the terminal block screw marked L1 on the PCB.
Figure 7 IN/OUT PCB connections for Ex d 120-240VAC
J1
GND
GND
L1 L2
L2
L1
b. Connect the neutral (common) power source wire to the terminal block
screw marked L2.
c. Connect the ground wire to the terminal block clamp marked GND.
5. Insert the PCB into the enclosure and fully tighten the PCB captive screw.
6. Place the cover on the housing and tighten it by turning it clockwise.
7. To ensure O-ring compression, the cover must be fully seated against the
housing when the threads are tightened. Turn the M3 set screw on the side
of the housing until the screw contacts the housing.
8. Ensure that the unused wire entries are sealed with the provided brass
M20-1.5 x 6 g stopping plug (equipment-certified).
9. Test the beacon for proper operation.