4-2
3. Perform a load test on the batteries in accordance with the battery manufacture’s specifications if their
operation is doubtful.
4. Check all connections and fasteners, tighten if necessary.
5. Battery replacement should be performed approximately every five years. This schedule is only a suggested
guideline. It may be necessary to vary the schedule if the siren is used frequently or if it is used in an
extreme climate.
6. Activate each siren function from all control points. Check for proper rotation and sound of siren signals.
After confirming that the installation is complete and it has been established that the siren is operating
properly, it is recommended that all control devices be padlocked to discourage tampering and vandalism.
4-3.PROBLEM CHECKLIST
DANGER
Electrocution or severe personal injury could occur when working on this
equipment. Service should only be performed by service technicians familiar
with 240VAC power and only after reading this manual.
The following checklist should be completed if the unit fails to operate properly. A VOM is required for some
measurements.
1. Are there any visible signs of damage?
2. Does the unit operate from the push-buttons?
3. Do K1 and K2 operate?
4. Is F3 open?
5. Are the main AC breakers tripped?
6. What is voltage supplied to TB3?
7. What are voltage readings of the individual batteries?
If assistance is required after completing the checklist, contact:
FWS Service Department
Federal Signal Corporation
2645 Federal Signal Drive
University Park, Il. 60466
1-800-524-3021
In Illinois: 708-534-3400
Fax: 708-534-4865
Содержание 2001DC
Страница 15: ......
Страница 16: ......
Страница 18: ...3 8 ...
Страница 21: ......
Страница 24: ...5 3 Figure 5 2 Transformer Rectifier Wiring To Control Unit Figure 5 3 2001tr Transformer Rectifier Parts List ...