12.   INSTALL BRACKETS

 

12.1 

Align holes in Bracket with second set of holes in from end of drain base.  

12.2 

Attach using two 1/2” screws. Repeat for opposite end of drain base. 

Do not over-tighten screws.

13.   INSTALL FOAM BLOCK:  

Lay Foam Block in brackets and align ends of foam with inside edge of Clamping Collar. 

14.   INSTALL MORTAR GUARD

 

14.1

  Install Mortar Guard over Foam Block and Brackets.  

14.2

  Center end to end over Clamping Collar.  

14.3

  Fully seat Mortar Guard to Clamping Collar on Drain Base.

15.   INSTALL MORTAR BED

 

15.1

  Follow industry standards to install mortar bed flush to top of Mortar Guard 1-1/4” thick.  

15.2

  Pack mortar into top and bottom of T-Channels to lock Mortar Guard in place. Be certain to maintain uniform thickness    

 

within entire bed.  

15.3

  Allow to dry before proceeding.

16.  REMOVE FOAM BLOCK AND BRACKETS

 

16.1

  Carefully remove Foam Block.  

16.2 

 Remove Bracket Screws and Brackets. 

17.   INSTALL SLOPE

 

17.1

  Apply tape over entire top surface of drain base. 

17.2

  Blocking between studs is recommended to support upturned membrane. 

HINT:

  

Notching the studs at each corner approximately 1/8” will provide space for folded Chloraloy corners and prevent  

 

backer board from bowing. If metal studs are used, the backer board can be “shimmed” slightly to provide space for the folded 

corners.

 

17.3

  Substrate should be sloped per code requirements (1/4” per foot) with no depressions where ponding could occur. 

17.4

  Where drains are incorporated into the installation (e.g. showers, commercial kitchens, decks, etc.), the substrate must be  

 

sloped towards the drain. 

17.5

  Allow to dry before proceeding. Remove tape from drain.

18.  INSTALL SHOWER PAN LINER

: Refer to shower pan liner installation instructions.

19.  INSTALL BACKER BOARD AND WALL WATERPROOFING

 Install 1/2” backer board and wall waterproofing according to 

manufacturer’s instructions.  

Caution: Do not puncture Liner.

 

NOTE: 

Plumbing codes and TCNA guidelines state that shower walls must be sealed with a vapor barrier or waterproofing 

membrane. 

20.  INSTALL PRE-STRAINERS

 

20.1

  Place short leg of Pre-Strainer down, facing drain hole. Install 1/2” pan head screw, align strainer and tighten screw.  

 

Repeat for opposite strainer 

NOTE: 

On 24” drain, place long leg of Pre-Strainer down, and secure in place.

21.  TEMPORARILY ATTACH STRAINER

 

 

21.1  Install Height Adjustment Screws:

 Screw in all 2-1/2” flat head height adjustment screws to approximately 1-5/8” above  

 

the clamping collar. 

21.2

  Place strainer over height adjustment screws.  

21.3 

Temporarily fasten with 2-1/4” pan head screws. 

Do not over-tighten screws.

 

NOTE:

 

Strainer attachment holes are not symmetrical. If screws do not align with holes in drain base, turn strainer end-to-end.

22.  TILE AND GROUT

 

22.1

  Protect the strainer with tape. 

22.2

  Tile and grout all surfaces following manufacturer’s instructions and TCNA guidelines. 

22.3

  Allow for 1/16” clearance between strainer and tile. 

Caution: Do not grout or seal this space. 

FreeStyle Linear Drain Full Mortar Bed 

Installation Instructions 

3