1075 Old Airport Road • Bristol, VA 24201   Phone (276) 669-4084 • FAX (276) 645-8206 • www.federalpacific.com • ISO9001:2015

SECTION IB-2B-800A

SUPPLEMENT TO INSPECTION AND MAINTENANCE RECOMMENDATIONS

TYPE PSE DEAD-FRONT PAD-MOUNTED SWITCHGEAR 

JUNE 2021

Page 3

j.  After cleaning and drying, inspect all metallic components of the 

switches and fuse mountings for corrosion. Operating components 

such as door latching mechanisms, springs, probes, switchblades, 

contacts, bus, ground studs and ground bars, and hardware items, such 

as nuts, bolts, washers, etc. displaying corrosion must be replaced.

k.  Lubrication of Non-Current Carrying Parts – Non-current carrying parts, 

such as operating mechanisms, hinges and latches, may be lubricated 

with any lubricants that the user has determined to be suitable for such 

applications.

l.  Lubrication of Current Carrying Parts – NYE Reolube 363 is the only 

approved lubricant for current carrying parts, as listed below. Apply 

only a thin coat of lubricant.

•  Fuse panel main contact stab.

•  Contact interface at the fuse-mounting lower contact (hinge end).

•  Contact interface at the fuse-mounting upper contact (receiver).

•  Main-contact stab (stationary contact) on the Auto-jet

®

 switches.

m. Install new vent plugs (or re-install cleaned existing plugs) at the bottom 

of the medium voltage compartment.

n.  Verify that all bolts remain torqued for tightness and circuit continuity.

o.  Reinstall the barriers.

p.  Remove the old roof gasket and install a new roof gasket.

q.  Ensure that the roof and interior are dry before re-installing.

r.  Verify the integrity of terminations in accordance with the terminator 

manufacturer’s recommendations. Replace any cable accessories or 

other third party components as appropriate.

s.  Verify the integrity of SML-20 components and end fittings,  FP-3097 

end fittings, SMU-20 and DBU fuse units/refill units and SML-4Z fuse 

holders and refill units in accordance with the fuse manufacturer’s 

recommendations.
•  All fuses and fuse refill units in the switchgear which were not 

sealed and known to be free of moisture must be considered to be 

potentially damaged and are to be discarded and replaced.

•  A silencer that has been submerged must be replaced as any residue 

inside may clog the exhaust path and cause a misoperation of the 

fuse assembly when a subsequent fuse operation occurs.

t.  Replace instruction manuals and any damaged or obscured name-

plates, ratings labels and hazard alerting signs (DANGER, WARNING, 

and CAUTION) of the pad-mounted switchgear.

u. 

BEFORE RETURNING THE SWITCHGEAR TO SERVICE:

i.  With the equipment de-energized, perform one or two mechani-

cal operations of each switch and fuse mounting to verify correct 

operation and alignment as described in Federal Pacific Instruction 

Bulletin IB-2A-210 – “Instructions for Installation and Operation, 

Type PSE. Dead-Front Pad-Mounted Switchgear, 15kV – 25kV.”

ii.  Verify the integrity of the insulation system in the equipment by 

applying high potential testing in accordance with applicable 

industry standards and the utility standard operating practices.

iii.  As the combined effect of having many components submerged 

in water, which may have been polluted with heavy levels of 

contamination, and where there is a potential for hidden dam-

age or hazards to go unnoticed, it is recommended that the unit 

be energized by a means the is initiated from a location OTHER 

THAN by operating the components such as switches and fuses 

in the specific switchgear unit being returned to service. For this 

purpose, Federal Pacific has developed a CO

2

 actuated Portable 

Remote Operating Mechanism (PROM). Refer to Federal Pacific 

for details on this product.

5.  If there is any doubt or suspicion about any component, it should be 

replaced.

Replacement Parts and Labels

If parts or labels are required, they may be ordered by contacting your local 

Federal Pacific Representative. A directory of the representatives can be found 

at 

www.federalpacific.com. You may also contact Federal Pacific directly 

at 276-669-4084. 

If parts or labels are ordered, the unit serial number must be provided along 

with the part description.

Table 1 — Recommended Electrical Clearances

15kV, 25kV

Pad-Mounted 

Unit Rating 

kV BIL

Recommended Clearances (minimum, in inches)

Phase-to-Phase 

or 

Phase-to-Ground 

Without 

Barrier

Phase-to-Phase

or

Phase-to-Ground

With Barrier

Energized

Bus

(or device)

to Barrier

Barrier-to-Ground

in Vicinity 

of

Energized Bus

(or device)

Terminator

or

Insulator

Skirts

to Barrier

95

5-1/2"

3"

1"

3/4"

1/2"

125

7-1/2"

5"

2-1/4"

2"

1-1/4"

CAUTION

Do not put any lubricant on switch probe or puffer contacts. Refer to 

Inspection Bulletin IB-2B-800, section 10,  "Lubrication of Current 

Carrying Parts".

      