I N S T A L L A T I O N   I N S T R U C T I O N S

Installation Instructions

1.   Consult local codes for specific installation requirements and restrictions applicable to 

your area. It is recommended that system supply pressure be at least 20psi (138 kPa).

2.   These instructions apply to the Series 825YA and LF825YA, sizes 

3

4

"- 2" (20 - 50mm) 

only. The assembly should be installed in the horizontal position with the relief valve 

on the side.

3.   Approved flow directions indicated above may be achieved by removing the two bolts 

at the inlet or outlet adapter flange and rotating the ball valve/adapter assembly into 

the desired configuration shown.

4.  

THE VALVE ASSEMBLY MUST BE INSTALLED WHERE RELIEF VALVE DIS-

CHARGE WILL BE ACCEPTABLE, OR WHERE RELIEF VALVE DISCHARGE CAN 

BE COMPLETELY DRAINED.

 The valve assembly must be installed where it is acces-

sible for periodic testing and maintenance. Clearances shown in the installation views 

apply to exterior, interior and pit/vault installations and are only recommendations. 

These minimums do not apply to removable protective enclosures. Refer to local 

codes for actual requirements in your area.

  

NOTE:

 The gap drain is not designed to catch the maximum discharge possible from 

the relief valve. The installation of FEBCO air gap with the drain line terminating above 

a floor drain will handle any normal discharge or nuisance spitting through the relief 

valve. However, floor drain size may need to be designed to prevent water damage 

caused by a catastrophic failure condition. Do not reduce the size of the drain line from 

the air gap fitting.

5.  

PRIOR TO INSTALLING THE VALVE INTO THE LINE, FLUSH THE SUPPLY LINE 

OF ALL FOREIGN MATERIAL.

 Failure to flush the supply line may cause the check 

valves to become fouled and require disassembly and cleaning.

6.   After  installation 

SLOWLY

 fill the assembly with water and bleed air from the body 

using the # 3 and # 4 test cocks. Test the valve assembly to ensure correct operation.

  

NOTE:

 All assemblies are tested at the factory for proper operation and leakage. If the 

valve does not pass the field test, it is most likely due to a fouled check valve. This 

is not covered by the factory warranty. The valve cover(s) must be removed and the 

check seats inspected and cleaned. Any damage or improper operation caused by 

pipeline debris or improper installation/start-up is not included in the factory warranty.

   In case of a possible warranty claim, contact your local supplier or FEBCO Representa-

tive. 

DO NOT REMOVE THE VALVE ASSEMBLY FROM THE PIPELINE.

7.   The assembly must be protected from freezing and excessive pressure increases. 

Thermal expansion or water hammer can cause pressure increases. These excessive 

pressure situations must be eliminated to protect the valve and system from  

possible damage.

8.   Plastic test cock plugs and tethers are provided (loose in box) for areas that  

require them.

Series 825YA and LF825YA

Reduced Pressure Zone Assemblies

Sizes: 

3

4

" – 2" (20 – 50mm)

18" (450mm) Min

12" (300mm) Min

6" (150mm) Min

12" (300mm) Min 

(Refer to Local Codes)

Vertical Up Flow In 

Vertical Down Flow Out

Figure 1

Horizontal Flow In 

Vertical Down Flow Out

Figure 2

Vertical Up Flow In 

Horizontal Flow Out

Figure 3

Horizontal Flow In 

Horizontal Flow Out 

Figure 4