manualshive.com logo in svg
background image

‘Parts List’

    

‘Assembly’

 

a.

c. install ‘debris screen’

into recessed area

over ‘drain valve’

b.

insert legs

 

into 

corners 

screw on ‘drain

valve’ into the

bottom of base

Lid

Working Tray

Working Tray

Base

Debris Screen

a.

c.

b.

‘Day One’

1.

2.

3.

4.

‘lower tray’

 on base    

set working tray on base,

soak 2 sheets of newsprint 

in water, lay in bottom of 

tray. (initial setup only)

Soak coir in water. 

Mix with shredded 

newsprint. 

1

 Litre or

 

1/4

 gallon

 

water

coir 

Spread mixture lightly and

evenly over the tray bottom

.

Add approx. 1/2 kilo

or one pound of worms.

newsprint

Отзывы: