Install the flow element, with the flow arrow (shown on Page 1) in the direction of media flow.  The element should be in the
center line of the process pipe or rectangular duct.  The flow arrow flat area is to be parallel ±2° with the media flow.  If the
remote control circuit option is used, the serial number of the flow element must match the serial number of the electronic
enclosure. Below are the most common instrument mounting options.

Flow Element Installation

Wiring Preparation

Before the instrument is opened to install the wiring, FCI recommends that the following ESD precautions be observed:

Use a wrist band or heel strap with a 1 megohm resistor connected to ground.  If the instrument is in a shop setting there should
be static conductive mats on the work table and floor with a 1 megohm resistor connected to ground.  Connect the instrument to
ground.  Apply antistatic agents such as Static Free made by Chemtronics (or equivalent) to hand tools to be used on the
instrument.  Keep high static producing items away from the instrument such as non-ESD approved plastic, tape and packing
foam.
The above precautions are minimum requirements to be used.  The complete use of ESD precautions can be found in
the U.S. Department of Defense Handbook 263.
Unscrew the instrument’s lid.  Remove the control circuit by prying up on the metal transformer tabs (under the serial
number label) while rocking the transformer back and forth.  This exposes the wiring block shown on the next page.

Flanged Integral Instrument Shown in a Customer Process

NPT Integral Instrument Shown in a Customer Process

FLT93L Local Inline Mount

Be sure the instrument is configured correctly for the applied input power.  If Factory Mutual
specifications were ordered, the input power should be 115 VAC and the instrument jumpers should be set
for 115 VAC as shown on Page 4.  Otherwise, the power input has been set for 220 VAC unless otherwise
specified.

Caution

Содержание FLT93F

Страница 1: ...Element Serial Number Also Showing FlowArrow Located near the FE enclosure It is also on the enclosure tag Electronics Serial Number It is also on the transmitter s FT enclosure tag C Recommended installation troubleshooting tools are an open ended wrench to fit the NPT connection an open ended wrench to fit the flanged fitting nuts and bolts a small flat blade screw driver for manipulating potent...

Страница 2: ...a 1 megohm resistor connected to ground Connect the instrument to ground Apply antistatic agents such as Static Free made by Chemtronics or equivalent to hand tools to be used on the instrument Keep high static producing items away from the instrument such as non ESD approved plastic tape and packing foam The above precautions are minimum requirements to be used The complete use of ESD precautions...

Страница 3: ... Remote Wiring Pictorial FLT93 Integral Wiring Diagram Maximum Distance for AWG Connection 10 ft 50 ft 100 ft 250 ft 500 ft 1000 ft 3m 15m 31m 76m 152m 305m AC Power 22 22 22 20 18 16 Relay 6A 22 16 12 Not Recommended Flow Element Wires 22 20 20 18 18 18 Requires a shielded cable with the shield wire connected to the control socket only Only qualified personnel are to wire or test this instrument ...

Страница 4: ...FOR FLT S AND J14 IS STANDARD FOR FLT93 F 0 75 WATTS 0 21 WATTS OFF OFF 0 49 WATTS 0 25 WATTS JUMPER ALARM NO 1 RELAY DE ENERGIZED WITH LOW FLOW LOW LEVEL DRY OR HIGH TEMPERATURE RELAY DE ENERGIZED WITH HIGH FLOW HIGH LEVEL WET OR LOW TEMPERATURE ALARM NO 2 RELAY DE ENERGIZED WITH LOW FLOW LOW LEVEL DRY OR HIGH TEMPERATURE RELAY DE ENERGIZED WITH HIGH FLOW HIGH LEVEL WET OR LOW TEMPERATURE J27 J26...

Страница 5: ...ch alarm can be setup for one of three applications flow level interface or temperature The following application specific adjustment procedures are generic and can be used for setting either or both alarms The mode switch must be in the RUN position Use the top figure on this page to help locate the adjustment potentiometers and LEDs Flow Applications 1 Ensure that the instrument has been properl...

Страница 6: ... turn the set point adjustment potentiometer clockwise until the LED turns on With the LED on slowly turn the potentiometer counterclockwise one turn past the point at which the LED just turns off The potentiometer may have up to one quarter turn of hystereses therefore if the mark is overshot the procedure should be repeated Detecting Wet Condition adjustment with sensing element dry Alert Give c...

Страница 7: ...ckwise until the LED turns off With the LED off slowly turn the potentiometer clockwise one half turn past the point at which the LED just turns on The potentiometer may have up to one quarter turn of hysteresis therefore if the mark is overshot the procedure should be repeated Adjustment by Measurement Option 2 Air Gas Flow Applications 1 Remove the instrument s enclosure cover 2 Ensure the confi...

Страница 8: ... No 2 counterclockwise until the LED turns off and then slowly clockwise just until the LED turns on 8 If this is the only flow application alarm to be setup then skip to the Continue With the Air Gas Flow Procedure Detecting Increasing Flow high flow alarm 1 Establish the excessive process flow condition and allow the signal to stabilize 2 Record the high flow signal The high flow signal should b...

Страница 9: ...Continue With the Air Gas Flow Procedure 1 Slide the mode switch to the RUN position 2 Establish the normal process flow condition For low flow alarm setups the status LED should be off For high flow alarm setups the status LED should be on 3 Establish the process alarm condition and monitor the voltmeter display 4 When the output signal passes through the calculated set point value the status LED...

Страница 10: ...Detecting Wet Condition high level alarm If the status LED is on turn the set point adjustment potentiometer R26 for alarm No 1 or R25 for alarm No 2 slowly counterclockwise just until the LED turns off OR If the status LED is off turn the set point adjustment potentiometer R26 for alarm No 1 or R25 for alarm No 2 clockwise until the LED turns on and then slowly counterclockwise just until the LED...

Страница 11: ...age is out of tolerance NOT OK The serial numbers on the control board and the sensing element must match If the serial numbers are OK then contact FCI Field Service c The Voltage is between 1 and 6 volts and changes with flow or level changes OK See item 7 Alarm Switch Point Settings d The voltage is still about 0 volts or the voltage is over 7 volts or the voltage is negative between 1 and 6 vol...

Страница 12: ...e secrets and proprietary information which is the property of Fluid Components International LLC FCI Disclosure of this data to you is expressly conditioned upon your assent that its use is limited to use within your company only and does not include manufacture or processing uses Any other use is strictly prohibited without the prior written consent of FCI Visit FCI on the Worldwide Web www flui...

Отзывы: