9
10
Installation Complete.
Secure the cover to the box
using the four supplied
screws.
Before installing the cover,
apply a generous amount of
silicone caulk around the
opening of the floor box
(where the flange sits) .
Verify that all the perimeter
has been properly sealed.
8
Leveling the Box
CORRECT
Tile or
Carpet
When a floor covering (tile, wood, carpet) thickness is
known in advance, estimating level to obtain a floor cov-
ering flushed with floor box is suggested (as shown on
the figure above) However it is not completely necessary
When concrete is flushed with box, the
cover can be applied.
When concrete is over poured, the cover
can still be applied.
Avoid this situation
***INCORRECT***
Concrete
Floor Box
Tile
Floor Box Cover
Straight edge cover - Flush Installation
C01 - Installation Instructions
-
1) Depending on the thickness of
the floor covering material, level the
box (before pouring concrete) as
necessary to obtain a flush finish
between the cover and the final floor
level as shown on the illustration.
2) Before installing the cover, apply
a generous amount of silicone caulk
around the opening of the floor box.
Verify that all the perimeter has been
properly sealed.
3) Secure the cover to the box using
the four supplied screws.
FBS FLOOR BOX SYSTEMS
25060 Hancock Ave
STE 103-125
Murrieta, CA 92562
1-800-216-8307
Questions?
1.800.216.8307
www.FloorBoxSystems.com
Questions?
1.800.216.8307
www.FloorBoxSystems.com
Questions?
1.800.216.8307
www.FloorBoxSystems.com
DISCLAIMER -
(Worldwide)
FBS Floor Box Systems
makes no warranties or rep-
resentations, whatsoever,
express or implied, as to the
merchantability, fitness or
suitability of this product.
Buyer / Installer of this
product must verify the
suitability or approval of this
for the specific use with the
local codes and/or authori-
ties having jurisdiction in the
area where the product will
be installed.