Installation:
1.
Choose a suitable location for your bathroom accessories and draw a horizontal and vertical pencil
line on the wall to mark the centre position.
2. For Towel Rails, note that the towel rail specified length is the centre to centre distance between the
2 mount plates.
3. Hold the mount plate in place centrally over the marked cross with the mount holes oriented
horizontally.
4. Trace the mount holes through the plate onto the wall with a pencil. Note adjustment in plate holes.
5. For masonry installation, drill three 7mm holes and insert the plastic wall plugs
6. For timber wall construction, drill three 6mm holes through the tiles/wall board only and drill 2mm
pilot holes into the timber.
7.
Screw into position with the stainless steel screws provided. Ensure that the mount plate is fitted
level and oriented correctly with the indentation at the bottom (this is where the grub screw on the
bracket fastens into the mount plate).
8. Hang dress rings over each mount plate.
9. Bring accessory into position over mount plates. While gently pressing accessory against wall, slide
dress rings up behind the flange section.
10. Place the bathroom accessory into position over the spigot of the mount plate.
11. Tighten into position with a grub screw into the fixing hole underneath the accessory and fasten in
place with the Allen key provided.
Center line
Trace screw holes
to wall
Indentation
Center line