faucet strommen 30909 Скачать руководство пользователя страница 2

Rough In

1.  Ensure that the in-wall nogging depth is correct and that the nogging is plumb. Position 

the noggin such that the front face of the noggin is 

62mm

 behind the 

front face

 of the 

finished tiled surface

. (note that there is a maximum of 

± 8mm adjustment

 at fit off). 

See diagram A

2.  Fix the body to the stud with the 

Mixer to the right

 and 

outlet to the left

See diagram 

B

3.  Connect the Hot supply to the inlet port on the bottom marked “H” and the Cold supply 

to the top Inlet marked “C”.

4.  Once plumbing is all connected pressure test the system. 

Do not exceed 500kpa 

pressure testing

 whether dynamic or static. Testing over 500 kpa will void the 

warranty for this product.

5.  The mixer body is fitted with a black shroud (also a tile guide) and the outlet with a 

clear plastic sleeve, these should always remain in place. The red dust cover may be 

removed for testing, but otherwise should remain in place.

6.  Wall sheeting and tiling can be laid 

close to the shroud

 and waterproofing membrane 

and grout can be adhered to the shroud.

7.  An indicator on the end of the shroud shows the range that can be accommodated at fit 

off for the finished tile face position.

8.  When tiling, note that the dress ring is 

51mm diameter

, so be sure to tile close to the 

shroud so there are no gaps showing after fit off. 

See diagram C

Mixer Fit Off

1.  Remove excess tile grout from around the shroud to allow a flush fitment of the cover 

ring.

2.  Remove the red dust cap and use a sharp knife to cut away the black shroud that 

protrudes past the finished tile surface and ensure that the area around the shroud is 

flat and free of protrusions.

3.  Place the red fiber washer onto the locking sleeve and screw the sleeve onto the body 

until up against the tiles. Nip up gently being careful not to damage or crack the tiles. 

See diagram C

4.  Note that there are 2 

splined adaptors

 supplied. For shallower installations use the 

shorter adaptor, for deeper installations use the longer adaptor. (tip, if you had to cut off 

more than 8mm of black plastic shroud, use the short adaptor, if you cut off less than 

8mm of shroud use the long adaptor)

5.  Note that the valve spline and the adaptor spline have 

un-splined segments

 it is 

important that these

 properly mesh

 and align when the adaptor is fitted.

6.  Ensure that the valve is in the off position (all the way anticlockwise), then fit the 

adaptor to the valve spline such that one of the 

milled slots is facing up

 and the other 

to the right.

7.  Ensure that the adaptor is oriented such that the grooved face is facing out.

 See 

diagram D

8.  Press the adaptor all the way on and fasten in place with the hex drive screw provided.

9.  Note that the dress ring includes indication markings. Place the ring over the locking 

sleeve and position such that the “I” symbol is facing the top, then loosely fit the 3 

attachment screws.

10.  To ensure that the dress ring is perfectly concentric to the valve, we have supplied a 

round plastic 

Concentricity spacer

. Slide this over the adaptor and locate it into the 

cover ring, then fasten the ring in place ensuring the “I” symbol is to the top.

11.  Remove and discard the concentricity spacer. 

12.  Note that there is a pre inserted grub screw in the handle that just protrudes into the 

bore.

13.  Place the black 

slip ring

 onto the step machined in the back of the handle then press 

the handle onto the tap with the 

wave form 

to the 

top.

 The handle should slide over the 

adaptor with the grub screw engaging in the slot.

14.  The handle should slide on until it presses smoothly up to the dress ring, square and flat.

15.  To fasten

, rotate the handle through 

90 degrees clockwise

 until the waveform passes 

over the 

small fastening hole

 in the dress ring. Inters the allen key through the hole and 

tighten the handle by fastening the grub screw onto the adaptor.

16.  The handle should now operate smoothly and freely to control the tap through 180 

degrees (half a turn)

17.  Progressive valves open clockwise, over the first 90 degrees of rotation the cold water 

opens to full flow, then from 90-180 degrees the valve goes from warm to hot. 

18.  Thoroughly check operation and seek assistance from Faucet Strommen should anything 

not be functioning to expectation.

Spout Fit Off

1.  Cut off what protrudes of the clear plastic sleeve around the outlet thread

2.  Remove the black cap off the outlet thread and apply a suitable amount of thread tape.

3.  Press the flange over the outlet and screw the outlet onto the thread until close to the 

wall, then press the flange up against the wall.

Diagram D

Отзывы: