Inspections
3PT Sprayer 973PT
Page 11
Inspections
Pre-Delivery
After the machine has been completely assembled, inspect it to be sure it is in good running order
before delivering it to the customer. Ensure each item is found satisfactory or proper adjustment
to the item(s) is made.
The following checklist is a reminder of points to inspect. It is neither an exclusive nor an
exhaustive list of points to inspect. See the
o
SMV
emblem is installed, protective
shipping tape
is removed from reflectors, and
lights
are installed.
o
All
grease
fittings
are lubricated (see
LUBRICATION and MAINTENANCE
section in this
Manual.)
o
Inspect to be sure all
nuts
are tightened to proper torque and all
cotter pins
are spread.
o
The
tires
).
o
Wheel bolts
are tightened to their specified torque(s).
o
Fertilizer
row units
are properly adjusted.
o
Warning
lights
are properly installed and operational.
o
All customer-ordered
attachments
are installed or are available for delivery.
o
Any parts scratched in shipment are touched up with
paint
.
o
All
shipping decals
are removed.
o
Transport pins
are inserted in the transport holes.
This machine has been thoroughly checked and to the best of my knowledge is ready for delivery
to the customer.
Signed: _________________________
Date: _________________________
Содержание 973PT
Страница 1: ...973PT 120 132 3PT SPRAYER OWNER S MANUAL...
Страница 2: ...820071 973PT 120 132 3PT Sprayer 2023 12 01...
Страница 33: ...SAFETY SAFETY 3PT Sprayer 973PT Page 33...
Страница 34: ...SAFETY SAFETY 3PT Sprayer 973PT Page 34 Main Frame...
Страница 35: ...SAFETY SAFETY 3PT Sprayer 973PT Page 35...
Страница 57: ...SPRAYER CALIBRATION SPRAYER CALIBRATION 3PT Sprayer 973PT Page 57 Table 3 Common conversions...
Страница 58: ...SPRAYER CALIBRATION SPRAYER CALIBRATION 3PT Sprayer 973PT Page 58 Table 4 Nozzle flow rates...
Страница 59: ...SPRAYER CALIBRATION SPRAYER CALIBRATION 3PT Sprayer 973PT Page 59 Table 5 Ground speed calibration...