background image

COMMERCIAL CANOPIES

8

Revision date: 06.22.10

Frame Assembly Procedure

Arrange the roof pipes on the ground adjacent to the  

correct couplers needed to assemble the roof.
1.  Connect the ridge pipes (58" purlin section) using a  

3-way coupler on the end rafter and 4-way couplers  

for the interior the sections. The assembled length 

should match the shelter length. 

 

 

NOTE:

 The last ridge pipe will finish with a 3-way 

coupler. Verify that the correct pipe is used.

2.  Attach the rafter pipes as shown in the illustration. 

Rafter pipes are 93".

3.  Connect the 3-way couplers to form the end rafters 

of the roof assembly and connect the 4-way cross 

couplers to construct the interior rafters.  

LAY OUT THE BUILDING SITE

After the site is prepared, identify the location of the shelter 

corners to help square the frame after it is assembled.

Taking these steps 

before

 assembling the shelter saves 

time and ensures that the structure is positioned as 

desired. The following procedure is a suggested method.

Its use depends on the size of the shelter, shelter 

application, the footings, and the method used to anchor 

the shelter.

SQUARE THE SITE

1.  Identify a corner where a building rafter will be  

positioned, drive in a stake, and string a line the exact  

width of the building and stake in place. 

2. 

Sting a line at least as long as the building from the first 

 

stake at 90°. 

 

NOTE:

 A transit can be used to ensure an accurate 90°  

angle, or the 3-4-5 rule can be used. Refer to diagram.  

Using multiples of 3-4-5 such as 6-8-10 or 12-16-20  

helps to maintain an accurate 90° angle.

3.  After squaring the position of the building and placing  

a stake at all corners, string a line between the stakes  

to mark the base of the building.

NOTE:

 Position the eye bolts of the couplers to the 

inside of the frame and tighten.

FRAME ASSEMBLY
NOTE:

 With longer shelters, assembly may require shelter 

to be assembled in short sections and then lifted and 

connected for completion. 

Gather the parts:
•  Pipes 1.66" x 93" plain (166P093) 
•  Pipes 1.66" x 58" plain (166P058)
•  Pipes 1.66" x 77" plain (166P077)
•  3-way couplers and 4-way couplers 

End 

Rafter

Interior 

Rafter

58"

Ridge 

Pipe

93"

4-Way Coupler

3-Way 

Coupler

End 

Rafter

Interior 

Rafter

Содержание 1420CC

Страница 1: ...06 22 10 2010 FarmTek All Rights Reserved Reproduction is prohibited without permission WeatherShield Commercial Canopies Photo may show a different but similar model STK DIMENSIONS 1420CC 14 W x 20 L 1430CC 14 W x 30 L 1440CC 14 W x 40 L ...

Страница 2: ...cturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the...

Страница 3: ...in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where ...

Страница 4: ...s 2 Verify that all parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions consult the Pictorial Parts Guide and all shelter diagrams for clarification or contact Customer Service NOTE At this time you do not need to open the plastic bags containing smaller parts such as fasteners or washers QUICK START GUIDE For an overview of this shelter and t...

Страница 5: ...the different parts and show you how they are used Not all parts are shown 102193 3 Way Coupler 102194 4 Way Coupler QH1061 Ratchet 102947 D ring Strap 103620b Plain End Strap Swaged Plain Swaged and Plain Rafter Sections not all pieces are shown FA4482B Tek screw FAMF01B Fender Washer 100441 Nut Setter ...

Страница 6: ...al injury and damage to the shelter fasten and tighten a Tek screw at each pipe and coupler joint To prevent cover damage install the Tek screw so that it does not touch the main cover or any optional side or end panels once these are installed 4 Way Coupler no lock bolt 4 Way Coupler includes lock bolt ADDITIONAL PARTS IDENTIFICATION NOTES In some instances there can be differences between the pa...

Страница 7: ... Rafter End Rafter Purlins WeatherShield Commercial Canopies NOTE Diagram above may show a shelter that differs in length or width from the actual frame The use and positions of ratchets may also differ from actual shelter Frame above is used for illustration purposes ...

Страница 8: ...od Its use depends on the size of the shelter shelter application the footings and the method used to anchor the shelter SQUARE THE SITE 1 Identify a corner where a building rafter will be positioned drive in a stake and string a line the exact width of the building and stake in place 2 Sting a line at least as long as the building from the first stake at 90 NOTE A transit can be used to ensure an...

Страница 9: ... frame is squared read or reread the MUST READ document and anchor the shelter ANCHOR THE SHELTER At this point anchor the shelter Consult the MUST READ document for anchoring information and suggestions Please call customer service at 1 800 245 9881 for additional anchoring information CAUTION The anchor assembly is an integral part of the shelter construction Improper anchoring may cause shelter...

Страница 10: ... 1 4000lb Pipe 1 315 See chart below Cover D ring strap 102947 plain strap 103620B Ropes long enough to reach over the frame supplied by customer Tek screws and Fender washers Duct tape supplied by customer WARNING To prevent damage to the cover and to prevent serious personal injury DO NOT attempt to install the cover on windy days 1 Locate the pipes for two 2 main cover conduits Each cover condu...

Страница 11: ...ain straps and ratchets on the opposite side of the shelter at the same rafters as the D ring straps NOTE Shelter shown above may differ in length from the actual model 6 To pull the cover over the frame attach ropes to both ends of the cover conduit Wrap the rope around the conduit a few times to prevent it from slipping off NOTE Depending on the length of the cover it may be necessary to attach ...

Страница 12: ...afters at the proper height Fasten ratchets to the outside of these rafters using Tek screws 17 As previously described make a slit in the cover conduit pocket and insert a 3 section of plain strap through the slit and around the cover conduit INSTALL COVER CONTINUED 18 Thread the strap ends into a ratchet and slightly tighten NOTE It may be necessary to remove excess strap if it binds up in the r...

Страница 13: ...ter Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover or the side panels that could cause damage Check the anchoring system to ensure that all components are tight and in good repair If the shelter is moved...

Страница 14: ...ANOPIES 14 Revision date 06 22 10 QUICK START GUIDE 14 Wide Commercial Canopies Height 10 8 1 16 6 5 Endwall Height 14 1 Width F FR RO ON NT T Grid Represents 12 Squares 1420CC 14 x 20 1430CC 14 x 30 1440CC 14 x 40 ...

Страница 15: ...vision date 06 22 10 FRONT PROFILE QH1061 Ratchet for End Rafter 166P077 77 Plain Pipe 166P077 77 Plain Pipe 166P093 93 Plain Pipe 166P093 93 Plain Pipe 102193 for End Rafter 102194 for Mid Rafter QH1061 Ratchet for End Rafter ...

Страница 16: ...COMMERCIAL CANOPIES 16 Revision date 06 22 10 SIDE PROFILE 1420CC 166P058 Length 20 0 5 0 Rafter Spacing R R Ratchets secured to rafters indicated with R ...

Страница 17: ...17 COMMERCIAL CANOPIES Revision date 06 22 10 SIDE PROFILE 1430CC 166P058 30 0 Length 5 0 Rafter Spacing R R R Ratchets secured to rafters indicated with R ...

Страница 18: ...COMMERCIAL CANOPIES 18 Revision date 06 22 10 SIDE PROFILE 1440CC 166P058 40 0 Length 5 0 Rafter Spacing R R R R Ratchets secured to rafters indicated with R ...

Страница 19: ...10 CONNECTIONS AND DETAILS Mid Rafter Purlin Connection View 2 End Rafter Purlin Connection View 1 102194 4 Way Connector Rafter Purlin View 1 End Rafter Purlin Connection View 2 Mid Rafter Purlin Connection 102193 3 Way Connector Purlin Rafter ...

Отзывы: