37
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
Revision date: 05.29.19
FRONT PROFILE
Pipe
Pipe
Pipe
Pipe
IMPORTANT:
If rafter support kits were
purchased for all or some of the interior rafters, do not install
the 116P120 chord pipe at the peak.
These are not used when support kits are installed. Review the support kit instructions to install those components during rafter assembly.
Содержание 106310PC
Страница 39: ...39 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 SIDE PROFILE 106311PC Ground Level...
Страница 40: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 40 Revision date 05 29 19 SIDE PROFILE 106312PC Ground Level...
Страница 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 05 29 19 CONNECTIONS...
Страница 43: ...43 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 CONNECTION FRAME DETAILS...
Страница 45: ...45 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 CONNECTION END WALL DETAILS...
Страница 51: ...51 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 Page reserved for customer notes...