background image

2. Installation sequence

ATTENTION:

 please comply with all the safety rules before proceeding with the installation.

1.  Run the cable starting from the battery towards the rear of the vehicle;

2.  Fix the cable without interfering with moving parts and parts subject to high temperatures;

3.  Fix the IBBC square bracket to the rear of the tractor;

4.  Connect the G and N connectors to the IBBC connector in the cab side (K,L);

5.  Stretch the cable towards the cabin;

6.  Fix the CPC In-Cab connector (O) inside the cabin;

7.  Connect the ACC wire (I) to an ignition point (+12V);

8.  Check and fix the position of the relays (E,F);

9.  Fix the eyelet (A) to the negative pole of the battery; 

10.  Fix the eyelet (B) to the positive pole of the battery.

3. Connections scheme

In-Cab cable

N

L

J

G

O

O

K

A

B

ISOBUS 

implement

ISOBUS 

implement cable

G7 Iso / G12

3

2

1

3.1 Connection to G7 / G12 

In-Cab cable

(CBCYFG0200)

1.1 Content of the package 

 

●Main Cable;

 

●IBBC connector;

 

●Metal bracket;

 

●Cab socket cable.

3

2

1

IBBC connector

Main cable

Cab socket cable

PIN-OUT

PIN n°

Function

1

Not connected

2

CAN-L

3

CAN-L

4

CAN-H

5

CAN-H

6

TBC-PWR

7

ECU-PWR positive

8

TBC-RTN

9

ECU-PWR negative

G12

G7 Iso bracket

Pin 1
Pin 4
Pin 7

Отзывы: