CONDITIONS FOR USE
OPERATION IN COOLING AND DEHUMIDIFICATION MODE
The operating range for cooling and dehumidification is from 16°C ~35°C.
LOCATION / POSITIONING
Install the mobile air conditioner in a sufficiently large space so that the air outlets
can operate normally without obstruction. The air conditioner must be at least 50
cm from a wall or any other obstacle.
ELECTRICITY SUPPLY
Before linking the air conditioner to the electricity supply, it is essential to check:
1. that the electricity supply is of sufficient voltage 230V ( + or - 6% ).
2. Ensure that you use an adequate fuse. Do not use wire or any other object to re-
place a defective fuse; you could cause a fire.
3. that the electricity line of the unit is connected to a 16 amp socket with a fuse adap-
ted to 16 amps and linked correctly to the earth.
4. The cross-section of the electric wires must be at least 1.5 mm
2
.
5. If the electricity supply cord of the unit is damaged or broken, REPLACE IT with the
cord H05VV-F, 3G 1.5 mm
2
(heating only), or by a supply cord H05VV-f 3G 1.5 mm
2
(for air conditioners without the cooling function). This work must be carried out by a
professional.
6. You must ensure that your electrical installation is in good condition before connec-
ting anything, and that your electric socket is connected correctly to the earth.
EN
50cm
112516-Manual-D.indd 20
3/01/14 9:54:33
Содержание 112516
Страница 73: ...112516 Manual D indd 73 3 01 14 9 55 30...