![Fanimation CCK8002 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/fanimation/cck8002/cck8002_instruction-sheet_3462883004.webp)
Figure 14
Figure 15
DIMPLED
GROOVE
MOUNTING
TAB (4)
SCREW TRIM
COVER RING
Install the remaining two screws
14.
removed in step 2
to secure the ceiling canopy to the ceiling bracket.
(Figure14)
Push the screw cover trim ring up to conceal the
15.
screws, such that the mounting tabs seat into the
dimpled grooves in the ceiling canopy midway between
the screws. (Figure 15)
.
e
t
e
l
p
m
o
c
s
i
t
i
k
g
n
il
i
e
c
-
o
t-
e
s
o
l
c
r
u
o
y
f
o
n
o
it
a
ll
a
t
s
n
I
16.
Reference your owners manual for any additional
assembly steps required for your Fanimation ceiling
fan.
Copyright 2011 Fanimation
2011/07 V.02
10983 Bennett Parkway
Zionsville, IN 46077
Toll Free (888) 567-2055
FAX (866) 482-5215
Outside U.S. call (317) 733-4113
Visit Our Website @ www.fanimation.com
NOTE: MOTOR WIRES
HAVE BEEN OMITTED
FROM DIAGRAM
Figure 13
MOUNTING
BRACKET
SCREW
SCREW
SLOT
SLOT
Lift the fan off the bracket hook and mount your fan by
13.
sliding the ceiling canopy over the mounting bracket
with the two loosened screws going into the slots in
the canopy. Be sure all wiring is tucked into the ceiling
canopy and is not pinched. Once the canopy is flush
with your ceiling, turn clockwise to seat the screws
into the keyed portion of the slot. Tighten the screws.
(Figure 13)