F&F LE-03-FPV-RST Скачать руководство пользователя страница 12

Содержание LE-03-FPV-RST

Страница 1: ...g direct observation of the increase in energy since the previous meter reset and an illuminated re ading field Compliance Purpose F F Filipowski L P Konstantynowska 79 81 95 200 Pabianice POLAND phon...

Страница 2: ...unit The meter is also equipped with a pulse output to indicate a change in total energy total energy imported energy exported energy Direct reading of the measured values and resetting of the au xili...

Страница 3: ...ST meter can display values No Function Format Unit View 1 Total active energy sum of energy exported and imported energy 6 1 kWh 2 Imported active energy 6 1 kWh 3 Eksported active energy 6 1 kWh 4 T...

Страница 4: ...ted active energy erasable auxiliary meter 6 1 kWh 7 Total active power 6 0 W 8 Active power signalling import of power 6 0 W 9 Active power signalling export of power 6 0 W Switching between views is...

Страница 5: ...indications of the auxiliary meters can be cleared at any time Only the auxiliary meters items 4 6 in the table above are reset To reset the selected auxiliary meter to zero select its value on the m...

Страница 6: ...th 1 000 pulses for each kWh of energy No ad ditional device is required for the correct operation of the meter The meter is marked with an individual factory number to enable its unambiguous identifi...

Страница 7: ...2 L2 IN 3 L3 IN 4 N IN 5 Connect the circuit to be measured or a single consumer to the terminals 5 L1 OUT 6 L2 OUT 7 L3 OUT 8 N OUT 6 Additional pulse receiver connected to terminals and The termina...

Страница 8: ...8 Wiring diagram...

Страница 9: ...city 30 lmax 10 ms measurement category CAT III mechanical resistance M1 electromagnetic resistance E2 insulation 4 kV 1 min 6 kV 1 2 s energy consumption of the meter 10 VA 2 W indication range 0 999...

Страница 10: ...us directly F F Filipowski L P declares that the device is in conformity with the essential requirements of The Low Voltage Directive LVD 2014 35 EU and Electromagnetic Compatibility EMC Directive 201...

Страница 11: ...ervoltage circuit breakers Before connecting the power supply make sure that all cables are connected correctly It is essential to observe the operating conditions of the meter supply voltage humidity...

Страница 12: ......

Отзывы: