- 6 -
1. Disconnect the power supply.
2. Mount the indicator on the rail in the distribution box.
3. Connect the neutral wire to terminal N.
4. Connect the input phase to terminal 1.
5. Connect the measured circuit or single receiver to terminal 3
(output phase L) and to N.
6. Connect terminals 23, 24 and 25 to the RS-485 network.
Program for test reading of the counted energy value and for
basic settings of the meter parameters.
Available at www.fif.com.pl (on the device’s subpage).
For communication of the meter with the computer, the USB
converter CN-USB-485 or any RS-485/USB standard is required.
installation 2-wire
rated voltage
230 V AC
minimum measured current
0.02 A
base current
5 A
maximum current
100 A
voltage measuring range
100÷289 V AC
measurement accuracy (EN50470-1/3)
class B
rated frequency
50 Hz
insulation protection class
II
housing
PC material
own power consumption
10 VA; 1 W
indication range
0÷99999 kWh
display
7-digits backlight LCD
(blue color)
Mounting
LE Config service programm
Technical data