FANANI / SEMI-FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS

FANANI / SEMI-FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS

Checking material

Roller bind

set

THIS BOX
CONTAINS

CONTENTS LABEL

myShell IGLOO Class ST is packed in strapped, reinforced cartons.

The following labels are applied to all cartons:

SUMMARY LABEL
-

customer (Name-Surname or Company)

-

order number

-

model

-

dimensions

IMPORTANT: before unpacking check that the data on

the summary label is correct.

IMPORTANT: contents may change and be divided

between various boxes due to their lenght or other details.

IMPORTANT: carton also contains the following

documents

SUMMARY SCHEDULE FEATURES/DIMENSIONS
FITTING INSTRUCTIONS
MOTOR INSTRUCTIONS
USE AND MAINTENANCE MANUAL

CONTENTS LABEL
-

roller blind set (box, bottom rail, fabric, etc.)

-

side guides

-

side beams and uprights

-

frontal gutter

-

others

EQUIPMENT BOX
-

wall supports

-

beam/uprights links

-

wind break supports (when present)

-

gutter equipments (when present)

-

REMOTE CONTROL/S

-
-
-

(manufacturer’s original)

-

(to be left with the

customer)

i

i

i

Cartons:

Delivery Note No.

To

Deliver to

carrier:

freight:

weight:

X/X

0000

NAME SURNAME / COMPANY
ADDRESS
POST CODE TOWN - PROVINCE

NAME SURNAME / COMPANY
ADDRESS
POST CODE TOWN - PROVINCE

SHIPPER’S NAME

CARRIAGE FORWARD

XX KG

SUMMARY LABEL

i

IMPORTANT :

screws, plugs and other fitting elements are not supplied; it is up to the installer to supply suitable
screws and supports (wall/ceiling), bases (floor mounted uprights), hardware or other suitable parts
for a safe and proper installation. The installer will certify the completed assembly by signing the
use and maintenance manual.

Before starting

SAFETY

The areas under the roller blind are deemed dangerous during installation. It is the installer's responsibility to
ensure that during these operations no person is wholly or partially in the danger zone. It is a good idea to display
the sign "WORK IN PROGRESS". Access the roller bind’s highest parts with suitable means in order to carry out the
installation safely. If the safety standards are complied with, no special personal protection equipment is needed.
There are no particular residual risks if not due to negligence by the operator. When working at great heights there
are risks of falling: take adequate precautions (harnesses and / or other safety devices).

PRELIMINARY CHECKS

Compare the documentation on hand (order form) to verify that the order is consistent in size and general
characteristics (structure colour, fabric colour, fastener types, optionals, etc., etc.)

PREAMBLE

Before installation is necessary to read carefully the assemby instructions attached. The mounting as the working
operations have to be execute by skilled personel only in scrupulous mode respectin the current security laws.

TRANSPORT, HANDLING, STORAGE

The roller blind is properly packed for a safe transport. In case of a not immediate mounting the package have to be
stored in a closed place with the intact package protected from hits and/or thumps and doesn’t have to be in contact
with corrosive substances. To prevent damages to components (examples : dents on the alluminuim profiles) handle
and move packages with care. If it is possible in case of manual handling of the packages the maximal weight per
person shouldn’t be more than 25 kg.

UNBOXING

At the receiving of the goods check the materials integrality. In case of anomalys do not proceed to the mounting
and inform the vendor company for the retrieval or the substitution.

INSTALLATION

It is installer’s responsability to check walls, floor or whatever else fastening support tho whom the roller blind is
settled.
The mounting is at installer’s charge qualified to release the document of THE CORRECT INSTALLATION
DECLARATION.
The electrical connections are at electrician’s charge qualified to release the document of THE CONFORMITY
DECLARATION.

Содержание IGLOO TECHST-GL

Страница 1: ...Rev 1 03 17 IGLOOTECHST GL SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS...

Страница 2: ......

Страница 3: ...terial Before starting Clearance check Wall fixing Floor squaring Load bearing gutter Uprights bases and load bearing gutter p 13 Lower purlins support Side beams p 15 Purlins p 16 Load bearing gutter...

Страница 4: ...IGLOO TECH ST GL 2 Versions 1 module 2 modules 3 modules FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS...

Страница 5: ...ht with side base upright with central base upright with hidden base side beam purlin fron load beam load bearing gutter wall beam purlin ceiling support wall beam support dividing upright 11x5 glass...

Страница 6: ...L CONTENTS LABEL roller blind set box bottom rail fabric etc side guides side beams and uprights frontal gutter others EQUIPMENT BOX wall supports beam uprights links wind break supports when present...

Страница 7: ...tructions attached The mounting as the working operations have to be execute by skilled personel only in scrupulous mode respectin the current security laws TRANSPORT HANDLING STORAGE The roller blind...

Страница 8: ...m IMPORTANT Before proceeding with the wall mounting supports fixing establish their position Maximal back height 1 Clearance check and brackets positioning Front joint detail Maximal back height Pass...

Страница 9: ...ll as indicated in the illustration below support gap is indicated in the technical sheet and drill the wall to place the plugs 2 fix the supports with adequate screws provided by the installer IMPORT...

Страница 10: ...supports Finished width 1 position the beam as per illustration below 2 fix the beam with with adequate screws provided by the installer IMPORTANT the beam position must center the bubble in spirit l...

Страница 11: ...upports dividing the gap between them as much equally as possible 2 place the beam on the supports and fix it with the provided screws threaded holdind plates pre inserted in the beam IMPORTANT suppor...

Страница 12: ...ANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 2D Purlins supports on wall beam 1 fix the purlins supports with the provided screws threaded holding plates pre inserted in the beam as per illu...

Страница 13: ...ANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS Squaring 3 i IMPORTANT DO NOT FIX THE BASES IN THIS PHASE 1 place the upright base to the ground in the correct position verify the measures and ma...

Страница 14: ...TECH ST GL FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 1 insert the internal tighteners and fix them 4 Load bearing gutter accessories Keep a gap of 15 20 cm between the external gutter ed...

Страница 15: ...UCTIONS 1 fix the uprights to the bases with the provided screws TSP M8x12 2 fix the tech internal bracket into the upright with the provided screws 3 fix the load bearing gutter to the uprights with...

Страница 16: ...IGLOO TECH ST GL FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 6 Lower purlins support 1 insert the holding plate into the slotted profile 2 fix the purlins supports on the load bearing gutt...

Страница 17: ...EMBLY INSTRUCTIONS Side beams 7 1 fix on the wall the side beam support 2 insert the side beam into the wall support rise the uprights with the load bearing gutter inserted and fix it on the side beam...

Страница 18: ...TECH ST GL FANANI SEMI FABRICATED COMPONENTS ASSEMBLY INSTRUCTIONS 8 Purlins 1 place the purlins and fix them with the provided screws ATTENTION in presence of led stripes insert them before placing t...

Страница 19: ...O TECH ST GL Frontal gasket 9 insert the black gasket and block it with the provided dowels Shape it after the guide and the side gutters positioning see chapter 17 ATTENTION gasket correct position f...

Страница 20: ...er caps iIMPORTANT Apply silicone on the entrance piece edge before inserting it into its location i IMPORTANT Fix the gutter side caps and apply silicone on the bottom and on the side edges FANANI SE...

Страница 21: ...ONS Glass holder profile 11 1 fix the glass holder profiles on all the purlins with the self drilling screws provided 2 insert the side filler part into the external glass holder profile part Insert t...

Страница 22: ...oles with the provided caps 5 place the frontal caps and tighten its screws 3 place the glass holder cover starting from A proceed with B and finish with C then fix it to the glass holder profile with...

Страница 23: ...Place the wall gasket and make sure to fix it about every cm 100 therefore apply silicone on the top edge i IMPORTANT IN CASE OF MORE MODULES IGLOO VERSIONS DO NOT CUT THE RUBBER GASKET FANANI SEMI FA...

Страница 24: ...Fanani srl www fananitende it Via Caduti di Sabbiuno 7 40011 Anzola dell Emilia Bologna Italy T 39 051 401320 F 39 051 403022 skype fananitende info fananitende it...