
INSTALLATION
Check the appliance is gas sound when you have finished.
26
You will need the following equipment to complete the
cooker installation satisfactorily:
• * Restraining chain and hook:
If the cooker is to be
supplied with gas through a flexible hose, a restraining
chain and hook MUST be fitted.
These are not supplied
with the cooker
but are available at most builders’
merchants.
•
Flexible gas hose: Must be in accordance with the
•
relevant standards.
•
Gas pressure tester/manometer.
•
Multimeter: For electrical checks.
You will also need the following tools:
1.
Electric drill
2.
Masonry drill bit (only required if fitting the cooker on a
stone or concrete floor)
3.
Wall plugs (only required if fitting the cooker on a stone
or concrete floor)
4.
Steel tape measure
5.
Cross head screwdriver
6.
Flat head screwdriver
7.
Spirit level
8.
Pencil
9.
Adjustable spanner
10.
13 mm spanner or socket wrench
11.
Screws for fitting the restraining chain and bracket
3 pan supports
Wok cradle (Supplied)
ArtNo.000-0001 90 Pan supports
ArtNo.000-0009 Wok ring, cast
Griddle plate (Supplied)
Teppanyaki (optional)
ArtNo.311-0043 - Griddle 09
Grill pan and trivet
2 Flat shelves with runners
Handyrack (optional)
Roasting tin (optional)
ArtNo.324-0003 Handyrack
ArtNo.324-0004 Roasting tin
Plinth
Tall oven shelves and shelf supports
(example shown)
ArtNo.000-0010 Tall oven shelves
Stability location bracket
Restraining chain & hook *
ArtNo.020-0021 - Restraining
chain & hook
Stability bracket
Conduit box
Small pan trivet
Содержание Nexus 90 Dual Fuel
Страница 1: ...USER GUIDE INSTALLATION INSTRUCTIONS Nexus 90 Dual Fuel Australia U111292 04...
Страница 2: ......
Страница 4: ...ii...
Страница 46: ...42 NOTES...
Страница 47: ...43 NOTES...
Страница 48: ...Clarence Street Royal Leamington Spa Warwickshire CV31 2AD England www falconworld com...