background image

Falc  - cod. 2023 02/19 

– Inglese - 

 

16 

5. GUARANTEE 

a)

 

The guarantee is valid 1 year from the date of the delivery. The company is committed to replacing parts which 
present material or manufacturing  defects in as short a time as possible. The manpower necessary for replacing 
parts is excluded from the guarantee. Any transport or forwarding expenses are excluded from the guarantee. 

b)

 

The guarantee ceases if breakage is the result of major force, incorrect use of the machine or any erroneous action 
carried out by the purchaser, employees or third parties. Repairs, replacements, modifications carried out by the 
purchaser or for the purchaser without the authorisation of the manufacturer are included in these actions. Incorrect 
use of the machine is understood to mean actions which are not listed in the user norms listed in this instruction 
manual. 

c)

 

Parts which due to their very nature or use are subject to inevitable deterioration or wear are excluded from this 
guarantee.  

d)

 

The bearings and oil retainers are not under guarantee. 

e)

 

The cardan shaft is not under guarantee. 

f)

 

The following standards are valid for the parts for which a warranty is requested: 
- the piece to be replaced must be returned to the manufacturer the moment in which a request is made for a new 
piece. 
- the spare parts are always invoiced when  forwarded. 

only examination by the manufacturer’s technicians can result in the guarantee being upheld and, 

therefore, accredited. 

 

 
 

6. NORMS TO BE FOLLOWED FOR CORRECTLY ORDERING SPARE PARTS 

In order to quickly deal with the orders relative to spare parts it is necessary to specify : 
a)

 

Type of machine, Model, Series number. 
(Eg. Pellicano 1800 series' number. XXXXX) 

b)

 

Number of the spare parts table in which the piece in question is to be located, identification number, piece code. 
(E.g. Table no. YY ; Item no. JJ ; Code KKKKKK) 

c)

 

Exact denomination of the item. 

d)

 

Quantity of pieces requested. 

e)

 

Instructions for the forwarding. 
(rail, postal package, courier, etc.) 

f)

 

The minimum delivery time for the parts requested is 3 days from the date of receiving the order. 

 
 
 

If parts of this manual are not sufficiently clear please contact the authorised dealer in your 
area or directly contact our technical and sales office.

 

 
 

The partial or whole reproduction of this manual is prohibited as is copying or disclosure of its contents without the 
express written authorisation of  Falc. 
Falc reserves the right to carry out any modifications on the machine deemed to be necessary at any time without each 
time updating this publication. 
 

Содержание PELLICANO

Страница 1: ...E USER MUST FULLY READ EACH SECTION OF THE MANUAL PARTICULARLY IMPORTANT NOTES REGARDING SAFETY ARE WRITTEN IN BOLD PRINT ANY USERS WHO MUST CARRY OUT PARTICULAR OPERATIONS ON THE MACHINE FOR WHICH NO...

Страница 2: ...alc cod 2023 02 19 Inglese 2 2 USE CONDITIONS The Pellicano and Master serie shredders are manufactured to be combined with a suitable tractor equipped with 3 point linkage and driven by a cardan shaf...

Страница 3: ...licano 1800 Special mm 1820 mm 800 mm 1020 mm 2400 kg 620 Pellicano 2100 Special mm 2100 mm 800 mm 1300 mm 2680 kg 660 Pellicano 1600 Special OUT mm 1680 mm 540 mm 1140 mm 2920 kg 650 Pellicano 1800 S...

Страница 4: ...mm 980 mm 2360 kg 790 Pellicano Master 2100 mm 2140 mm 800 mm 1340 mm 2720 kg 850 Pellicano Master Super 1600 mm 1600 mm 540 mm 1060 mm 2840 kg 850 Pellicano Master Super 1800 mm 1780 mm 540 mm 1240 m...

Страница 5: ...edges in the breakflame band and underneath electrical cables They are further recommended for the shredding of grass and pruning in fruit vineyard olive and citrus cultivation They may also be used f...

Страница 6: ...2100 Special OUT 50 80 37 59 kg 2600 mm 2100 Pellicano Pell Super Master Master Super 1600 80 90 59 66 kg 2500 mm 1600 Pellicano Pell Super Master Master Super 1800 80 100 59 74 kg 2700 mm 1800 Pellic...

Страница 7: ...take off PTO Prior the lifting the shredder using the tractor lifter the operator must ensure that the power take off PTO is removed and that the rotor is at a standstill d It is strictly prohibited t...

Страница 8: ...to the upper pin of the 3 point adjusting so that the machine assumes a horizontal position with regards to the ground f Position the cardan shaft and check that its ends are properly connected with t...

Страница 9: ...me that the he she uses the shredder The rear roller must always be rested on the ground during work both with the shredder in a horizontal position or inclined The tractor s forward speed is independ...

Страница 10: ...tor g Detach the shredder from the tractor s 3p linkage drawing out first the split pins which lock the pins and then removing the pins themselves h Get back on the tractor and move it forward in orde...

Страница 11: ...ar roller s linkage flange one or more holes A screws to be loosened for adjusting the roller B screws to be moved to adjust the roller b The work height adjustment is correct when the knives or the h...

Страница 12: ...ually the cardan joint is supplied by Falc and it is suitable for the effective power necessary for the tractor shredder coupling In case of replacement never use a cardan joint with less features tha...

Страница 13: ...ble both the plate which protects the belt cover guard as well as the belt cover guard b Loosen the screws A which lock the multiplier c Loosen the screws B so that it is possible to draw the belts ou...

Страница 14: ...oosen the screws A Remove n x screws A and insert in the threaded holes B uniformly tightening them The pulley may be easily drawn from the shaft after the screws have been turned a number of times b...

Страница 15: ...r have been consumed Replace the supports Residues and incrustations are visible on the knives hammers of the rotor Clean the knives hammers and the rotor If the rotor turns at a slower speed than tha...

Страница 16: ...e piece to be replaced must be returned to the manufacturer the moment in which a request is made for a new piece the spare parts are always invoiced when forwarded only examination by the manufacture...

Отзывы: