background image

AC Voltage Detection Procedure

For maximum sensitivity, begin by placing the detector in a 

position away from live wiring.

1.

 Set the selector switch to the "

AC WIRE

" position.

2.

 

Calibration:

    Depress and hold the 

TEST

 button down , the detector 

    will begin calibration. When it sounds two beeps, the 

    calibration is complete. Always keep the 

TEST

 button 

    depressed throughout all the following procedures.

3. Detection:

    a. Place the detector on the surface and slowly move the 

        unit sideways (fig 1). When the top signal LED lights 

        and buzzer sound continuously, stop moving, the 

        detector has located the edge of a live wire, mark a 

        spot in the groove on the walls surface (fig 2).

    b. 

Continue moving sideways across wall until all the 

        signal LEDs and the buzzer turn off, then reverse 

        direction and locate the opposing edge by using the 

        same procedure. When the LED lights and buzzer 

        sounds continuously stop moving and mark a spot in 

        the detectors groove on the walls surface (fig 3), the 

        midpoint between two marks is the centre of live wire.

8

Fig.1

Fig.2

Fig.3

Содержание FAI DET31

Страница 1: ......

Страница 2: ...d identify a stud centre 3 Find AC voltage and scan to trace live cables 4 Metal scanning to find nails pipes rebar and other hidden metal objects This detector may be used to carry out the following...

Страница 3: ......

Страница 4: ...urn the detector on You must depress and hold this switch down to calibrate the detector or when you wish to perform detection operation 6 Selector switch A three position switch used to select the re...

Страница 5: ...roughout all the following procedures 3 Detection a Place the detector on the surface and slowly move the unit sideways fig 1 When the detector moves closer and closer to the stud the signal LEDs will...

Страница 6: ...en performing a calibration the detector will not work correctly 3 The surface of wall along which you want to detect should be flat and dry 4 We recommend that you also carry out a metal detection sc...

Страница 7: ...he unit moves closer and closer to a metallic object the signal LEDs will light sequentially fig 1 When the top signal LED lights and the buzzer sounds continuously the unit detects the metallic objec...

Страница 8: ...etector on the surface and slowly move the unit sideways fig 1 When the top signal LED lights and buzzer sound continuously stop moving the detector has located the edge of a live wire mark a spot in...

Страница 9: ...ate static electricity and cause a false indication 3 Leakage Currents Because of the extremely small current required to cause a reading on the detector an apparent false reading may be seen in some...

Страница 10: ...id unexpected problems please be aware that different types of material may be close together A stud joist pipe metal object or wire may be adjacent to each other 4 If you do not intend to use the det...

Страница 11: ...wall texture paint etc Operation condition 7 40 C below 75 RH Storage condition 20 50 C below 85 RH Battery 9V 6F22 or equivalent Dimension 163 x 74 x 26mm Weight approx164g including battery Stud mod...

Страница 12: ...eplace the battery door correctly Depleted batteries should be disposed of at your local recycling facility 12 DISPOSAL OF THIS PRODUCT Dear Customer If you at some point intend to dispose of this art...

Отзывы: