background image

STEP 1 • POST/MOUNTING SURFACE PREPARATION

Plumb post/mounting surface.

Slide vinyl post sleeve and one piece post trim ring over post.

STEP 2 • BOTTOM RAIL & BRACKET PREPARATION

A)

 Determine height of bottom rail. This should be no more than 4" and no 

less than 2" for 36" high railing and no greater than 2" for 42" high railing. Make 

a pencil mark at bottom of the bottom rail on the post. Measure up 3/8" above 

previous mark, then square and center the bottom of the black mounting bracket. 

Mark screw holes in the four (4) corners of the bracket and then pre-drill four (4) 

5/32" holes. Screw the bracket base into place with four (4) #12 x 1-1/4" pan head 

screws. Repeat on opposite post.

B)

 

After the bottom black mounting bracket is in place, measure from 

bottom 

of black mounting bracket

 up and mark with pencil. Please use the following 

measurements in accordance with product style and height:

 

36" V210 Rail = 31-3/4"     •     36" V220 Rail = 31-1/4"
42" V210 Rail = 38-1/4"     •     42" V220 Rail = 37-3/4"

 

This will be the mounting mark for the 

bottom of the top black mounting 

bracket.

 Square and center the top black mounting bracket on mark and pre-drill 

four (4) 5/32" holes. Screw into place using four (4) #12 x 1-1/4" for V210 Railing 

or four (4) #10 x 2" pan head screws for V220 Railing. Repeat on opposite post.

C)

 Measure the inside span between black mounting brackets for bottom rail. 

(Make sure you have equal and maximum amount of spacing between baluster 

pocket and post on each end.)

 Cut bottom rail to length squarely with a power 

miter box or hacksaw. You may cut vinyl and aluminum insert at same time.*

 

STEP 3 • INSTALL BOTTOM RAIL 

A)

 With bottom rail cut to length, slide bracket trim ring onto each end of 

bottom rail, flat side towards end, facing post. (TIP: You may want to cut blocks 

to proper height for rail to rest on.) Set bottom rail into place and align bottom 

rail with bottom rail height bottom mark from 

Step 2A

.

B)

 

With the bottom rail in place, insert one (1) #8 x 1" self-tapping pan head 

screw through one of the holes along the side of the black mounting bracket, 

through vinyl rail and into aluminum insert. 

Only one (1) screw per side is 

needed

. Slide bracket trim ring onto black mounting bracket.

Repeat on opposite post.

NOTE:

 If bracket trim ring will not snap on black mounting bracket, make sure 

mounting screws (bracket to post connection) are not over-tightened.

STEP 4 • INSTALL BALUSTERS & TOP RAIL 

A)

 

Measure the inside span between black mounting brackets for top rail. Cut 

top rail to length to match bottom rail. If post is plumb, top rail should be same 

length as bottom rail. Make sure distance from baluster pocket to post on each 

end is the same for both top and bottom rail. Place a baluster in each hole. Slide 

bracket trim ring on both ends of top rail, flat side towards end, facing post. 

From one end, begin to insert top of balusters into corresponding pocket holes 

and be sure rail slides down into black mounting brackets side guides.

B)

 

Once all balusters are in place, the top rail will rest in the black mounting 

bracket. Insert one (1) #8 x 1" for V210 railing, (1) #10 x 1" for V220 railing 

self-tapping pan head screw through one of the holes along the side of the 

black mounting bracket, through vinyl rail and into aluminum insert. 

Only one 

(1) screw per side is needed

. Slide bracket trim ring onto black mounting 

bracket. Repeat on opposite post.

NOTE:

 If bracket trim ring will not snap on black mounting bracket, make sure 

mounting screws (bracket to post connection) are not over-tightened.

STEP 5 • CUT VINYL POST SLEEVE TO HEIGHT

After your railing is installed, you may wish to trim the top of the vinyl post 

sleeves before installing post caps. We recommend measuring up 2-1/2" to 

3-1/2" from the top of the mounting bracket trim ring and making a pencil 

mark prior to cutting. 

NOTE:

 Finished post height with post cap may be 

adjusted for personal preference and appearance. Once all marks are 

satisfactory, cut the vinyl sleeve using a hand or power saw. 

(Be sure to cut top 

of post square.)

You are now ready to install your post cap.

Apply a small amount of PVC glue or silicone caulk to the inside lip of the post 

cap and mount in place.

STEP 2A

STEP 2B

STEP 2B

STEP 2C

STEP 2C

STEP 3A

STEP 3B

STEP 4A

STEP 4A

STEP 4B

STEP 2A

STEP 1

STEP 5

STEP 5

TOP

RAIL

*See saw blade manufacturer’s specs for proper blade

NOTE: If V210 rail bracket trim ring will 

not snap on black mounting bracket, make 

sure bracket to post mounting screws are 

not over-tightened.

V210 & V220 VINYL RAILING 

INSTALLATION GUIDE

Отзывы: