Fairport FP300 Скачать руководство пользователя страница 6

 

 

5. 

STARTING THE ENGINE 

 
Check oil level. 
Turn fuel tap on. 
Put speed control lever to tick-over. 
If engine is cold, close the choke (petrol engines only). 
Turn engine switch to ON(1) position. 
Pull the starter rope toggle lightly until resistance is felt, then pull briskly using quick 
short  pull.  Do  not  pull  rope  to  its  full  extent  or  allow  toggle  to  snap  back  against 
engine. Return gently to avoid damage. 
 
When the engine is warm, open choke. 
Position  engine  speed  control  lever  to  give  required  engine  speed  (usually  full 
speed). 
Commence vibration – the compactor is self – travelling. 
To  stop  the  engine,  postion  the  engine  speed  control  to  slow  and  turn  the  engine 
switch to off(0). 
Turn the fuel valve off. 

6. 

OPERATOR INSTRUCTIONS 

Read section (1) - Safety. 
NOTE:  Drive between engine and vibrator is through a centrifugal clutch.  Vibration 
will commence as engine speed is increased. 
Position the engine speed control lever to give required speed (usually full speed). 
Commence compaction.  The compactor is self-travelling.  Its speed of travel and the 
number of passes required to achieve optimum compaction depends on the type and 
condition of material being compacted and the layer depth. 
Uniformly  graded  granular  material  compacts  far  more  efficiently  than  wet  cohesive 
material. 
When  Compacting  block  paving  always  use  a rubber  attachment  mat,  contact  your 
agent for details. 
When compacting blacktop always use a water spray, contact your agent for details. 
 
Do not run the machine on solid surfaces, as this is likely to cause damage. 

7. 

VEE BELT ADJUSTMENT 

It  is  important  to  note  that  belt  tension  in  this  application  is  much  less  than  is 
generally accepted as normal.  Too high a belt tension may lead to engine damage, 
excessive  vibration  in  the handle,  short  belt  life  and  short  vibrator  shaft  bearing  life 
due  to  excessive  transmission  of  vibration  through  the  belt.  Correct  adjustment  is 
achieved by moving the engine back to just take the slack out of the belt. With light 
finger  pressure  on  top  of  the  belt  and  at  the  centre  of  the  span,  a  deflection  of 
between 5mm and 10mm is expected. 

 

5

Содержание FP300

Страница 1: ...CE MANUAL PLATE COMPACTOR MODEL FP300 FPC320 GB Version Blagden Street Sheffield S2 5QS ENGLAND Tel 44 0 114 276 7921 Fax 44 0 114 272 0965 Email sales fairport uk com Web www fairport uk com FAIRPORT...

Страница 2: ...ME 4 4 ROUTINE MAINTENANCE 4 5 STARTING THE ENGINE 5 6 OPERATOR INSTRUCTIONS 5 7 VEE BELT ADJUSTMENT 5 8 WARRANTY CONDITIONS AND CLAIMS PROCEDURE 5 CONDITIONS 6 CLAIMS PROCEDURE 6 9 REPAIRS AND ESTIMA...

Страница 3: ...ut adequate ventilation Do not run engine in an area that has a hazardous or explosive atmosphere Disconnect H T lead from spark plug on petrol engines before carrying out any maintenance Turn off fue...

Страница 4: ...REA sq m WEIGHT kg FPL300 614 550 2 300 0 095 54 FPL320 614 550 2 320 0 10 55 PERFORMANCE MODEL CENTRIFUGAL FORCE kN COMPACTION RATIO kg m VIBRATION LEVELS m sec FPL300 10 568 2 87 FPL320 10 550 3 04...

Страница 5: ...of all fastenings after first days use thereafter check monthly Check belt tension after first days use thereafter check monthly Clean air filter daily if working in dusty conditions Clean base plate...

Страница 6: ...full speed Commence compaction The compactor is self travelling Its speed of travel and the number of passes required to achieve optimum compaction depends on the type and condition of material being...

Страница 7: ...ct Carriage costs will be refunded if warranty is accepted Warranty claims will not be considered where there is evidence that failure has been caused by carelessness improper use negligence inadequat...

Страница 8: ...with any repair To partly cover the cost in dismantling cleaning and inspection a small charge will be made this however will be waived upon receipt of your official instructions to proceed with the r...

Страница 9: ...300 1 5 W432 6 M6 Spring Washer FPC320 1 5 W432 8 M8 Spring Lock Washer FPC300 1 6 W14719 Retaining Washer FPC320 1 6 P80120 Retaining Washer FPC300 1 7 W14666 Clutch Spacer FPC300 1 8 W14689 Belt Gua...

Страница 10: ...ne Bed Plate 1 4 W14680 Engine Fixing Plate 1 5 W418 8 M8 Washer 4 6 W437 8 30 M8 x 30 Hex Setscrew 4 7 W440 8 M8 Nut 4 8 W432 8 M8 Spring Lock Washer 4 9 W88914 AV Buffer 1 10 W418 10 M10 Washer 1 11...

Страница 11: ...PARTS DIAGRAM MACHINE 10...

Страница 12: ...rom Serial No 58428 1 9 W14656 Pulley 1 10 W435 10 40 Hex Bolt M10 x 40 1 11 W68574 Filler Cap 1 12 W418 10 M10 Washer 1 13 W535 10 M10 Nordlock Washer 1 14 W455 10 30 M10 x 30 Socket Head Cap Screw 2...

Страница 13: ...PARTS DIAGRAM BASEPLATE ASSEMBLY 5 2 2 3 6 1 3 4 5 7 8 9 10 11 17 13 14 15 16 18 19 20 21 22 22 23 24 25 24 12...

Страница 14: ...Description Qty Required 1 W14667 Handle 1 2 W88913 AV Mount 4 3 W437 8 16 M8 x 16 Hex Setscrew 4 4 W480 8 M8 Nyloc Nut 4 5 W432 8 M8 Spring Lock Washer 4 6 W14668 Top Plate 1 7 W14683 Handle Pivot B...

Страница 15: ...PARTS DIAGRAM HANDLE ASSEMBLY 13...

Страница 16: ...acket 1 Common 3 M10 X 40 Coach Bolts 4 4 W480 10 M10 Nyloc Nut 4 5 W418 10 M10 Washer 4 The paving mat kits have been designed to allow the machine to be used for compacting hard paving To fit the ma...

Страница 17: ...ed FPC300 W14693 Spray Bar Comp 1 W14692 Spray Bar 1 2 W80566 Insert 2 FPC320 W14692 Spray Bar Comp 1 W14685 Spray Bar 1 2 W80566 Insert 2 Common 3 W14670 Water Bottle 1 4 W88460 BSP M F Elbow 1 5 W87...

Страница 18: ...PARTS DIAGRAM WATER SPRINKLER KIT 16...

Страница 19: ...le Heath Stockport Cheshire SK3 0XU GB USES THE FOLLOWING STANDARDS BS EN 292 1 BS EN 292 2 BS EN 294 BS EN 500 4 CONFORMS TO THE FOLLOWING STATUTORY INSTRUMENTS THE SUPPLY OF MACHINERY SAFETY REGULAT...

Отзывы: