23
STEP 6: INSTALL PUSH FITTINGS
STEP 1: DRIVE TWO MOUNTING SCREWS
STEP 8: INSTALL TUBE TO DRAINBACK TANK
STEP 4: CONNECT TO COAXIAL ADAPTER
STEP 7: ENSURE PROPER INSERTION
STEP 5: CONNECT TO COAXIAL ADAPTER
STEP 3: CONNECT FLEXIBLE HOSES
STEP 2: REMOVE PROTECTIVE COVERS
5: Circulation Module Installation
Mark two hole locations 6-3/4” apart on the wall along the stud at least 4” off the floor. Check for level and drive two
5/16” x 1-5/8” lag screws with a 7/16” socket, leaving about a 1/4“ gap to the wall.
Set the circulation module onto the mounting bolts. Make sure the mounting is sturdy. If necessary, adjust the mount-
ing bolts for a tight fit.
Connect the flexible braided hoses to the threaded pipes on top of the circulation module. The flexible hoses only fit
one way (small to small and large to large). Do not use teflon tape or pipe-thread compound on these connectors.
Screw the return side (i.e., larger) flexible hose onto the coaxial tank adapter opposite the drain valve. Do not over-
tighten this connection. Do not use teflon tape on this connection.
Push the 3/4” to 1/2” reducer push fittings over the smooth pipes on top of the circulation module as shown.
Screw the suction side (i.e., smaller) flexible hose onto the coaxial tank adapter. Do not over-tighten this
connection. Do not use teflon tape on this connection.
The pipe must be inserted to the indicated depth to ensure a good seal.
Cut 6”–8” of tubing and install on circulation module to connection marked “FROM BOTTOM OF DRAINBACK TANK.”
Install drain valve. Cut length of tubing to install between drain valve and bottom of drainback tank and install.
Содержание Drainback 200 Series
Страница 33: ...31...