![fadini APROLI 380 LB Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/fadini/aproli-380-lb/aproli-380-lb_instruction-manual_3168734008.webp)
FIXING THE TELESCOPIC ARM TO THE FERRULE WITH SQUARE HOLE
Supply the electric motor with power (230 V - 50 Hz) to allow the first running test.
As a factory standard, Aproli 380 LB, either right- or left-handed, is supplied with the motor square shaft rotated to the end of the
permitted stroke, to be installed on to a door in fully closed position (either on panel 1 or panel 2).
For the door to stay perfectly locked in closed position, the rotation shaft is not to be at the end of the stroke (as it cames from the
factory), therefore it should be rotated
at least 5°
approximately to the other way, to ensure in this way that Aproli 380 LB keeps
pushing the door to close (Pic. 10).
Fit the square-holed ferrule to the motor shaft and fasten it by the retaining pin matching the hole in the shaft.
After rotating the ferrule 5° at least in the direction indicated in Pic. 10, weld the sliding bar on to the top of it making sure the bar
and the shaft hole are aligned, in the direction of the wall fixing plate (Pic. 11).
Pic. 11
Pic. 10
English
NOTE WELL: protect
Aproli 380 LB while welding.
Stop plate in closed position
(optional), to provide the door
with a secure stop on closing
Bar sliding in the direction of
the wall fixing
!
NOTE WELL: before welding the end of the sliding bar on to the top
of the square-holed ferrule, rotate the shaft of 5° at least.
!
panel 1
panel 1
panel 2
panel 2
at least 5°
at least 5°
APROLI 380 LB
LEFT-HAND
APROLI 380 LB
RIGHT-HAND
Hole to take the
retaining pin
fastening the
ferrule
8
Oil-hydraulic operator for bi-parting double folding doors
APROLI 380 LB
istr_aproli380lb_GB.ai 8 25/10/2018 17:11:33