!
"
#
$
$
%
&
&
'
(
)
*
+
,
-
.
/
0
.
0
-
1
0
/
2
3
,
1
-
-
.
4
5
2
6
5
'
.
0
5
2
+
1
7
)
8
&
&
,
1
9
.
(
)
*
:
;
:
3
/
<
2
=
+
>
?
8
*
*
'
8
*
*
'
8
*
*
&
&
@
$
*
@
1
2
3
-
.
+
.
A
/
4
.
B
-
.
3
1
&
&
.
2
0
.
0
C
D
-
1
=
2
0
9
.
E
.
9
7
)
8
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS
COMPLETE UNIT.
Surface Fix
Tord Bench
(surface fix only)
1. Install suitable foundation pads (see illustration) each with top face at ground level
2. Position bench in correct orientation with bases centrally on foundation pads, then mark hole positions through base frame.
3. Remove the bench; drill holes Ø14mm x 175mm deep
4. Clear debris from holes.
5. Fill the holes to within approximately 35mm from the top with Hilti HY150 resin (or similar). Lift the bench (with threaded
anchor rods/capnuts in place) and carefully lower the anchors into the holes, leave for two hours before using.
6. Using a torque wrench, tighten nuts and washers over base frame to 30Nm to fasten down the bench.
7. Check level
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on
stainless steel components.
4
TORD installation