Fabtech FTS71002 Скачать руководство пользователя страница 2

 

 

READ THE FOLLOWING BEFORE BEGINNING INSTALLATION 

 

DO NOT ALTER THE FINISH OF THESE COMPONENTS, EXAMPLE- CHROMING, ZINC PLATING OR 
PAINTING. CHANGING THE FINISH CAN CAUSE STRUCTURAL FATIGUE OF COMPONENTS. 

 

 

READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING 
INSTALLATION!  IF THESE INSTRUCTIONS ARE NOT PROPERLY FOLLOWED, SEVERE FRAME, 
SUSPENSION AND TIRE DAMAGE MAY RESULT TO THE VEHICLE. 

 

VEHICLES THAT WILL RECEIVE OVERSIZED TIRES SHOULD CHECK BALL JOINTS, TIE RODS ENDS 
AND IDLER ARM EVERY 2500-5000 MILES FOR WEAR AND REPLACE AS NEEDED. 

 

A VEHICLE FRONT END ALIGNMENT MUST BE COMPLETED BEFORE INSTALLATION OF THIS 
STEERING SYSTEM  
 

THE PARTS INCLUDED IN THIS KIT NEED TO BE GREASED AT ALL THE GREASE FITTINGS 
BEFORE DRIVING THE TRUCK, FALIURE TO DO SO WILL VOID THE ENTIRE WARRANTY.

 

 

THIS KIT IS DESIGNED TO BE USED IN CONJUNTION WITH FABTECH CROSSMEMBER LIFT 
SYSTEMS ONLY.  

 

Tool List:     (NOT INCLUDED) 

 

Floor Jack & Jack Stands 

 

Assorted Metric & S.A.E Sockets

 

 

Torque Wrench 

 

Large Hammer 

 

Large Crescent Wrench 

 

Tape Measure 

 
 
 
 
 
 

INSTALLATION INSTRUCTIONS 

 

1.

 

Disconnect the negative terminal on the battery.  Jack 
up the front end of the truck and support the frame 
rails with jack stands. Remove the front tires.  

NEVER WORK UNDER AN UNSUPPORTED 
VEHICLE!

 

2.

 

Starting on the driver’s side of the truck, remove the 
nut securing the tie rod end to the spindle.  Using a 
large hammer strike the spindle to break loose the tie 
rod end. Save the factory hardware. 

USE CARE TO 

NOT HIT THE THREADS OF THE TIE ROD 
END

.  SEE PHOTO BELOW.  

 

Отзывы: