6.
Locate and install the rear lift blocks, the factory block will be
positioned on top of the new Fabtech block, with the short
center pin of both blocks facing down, to the axle. The short
end of the blocks should face to the front of the vehicle.
Using the supplied u-bolts, nuts, and washers align axle, lift
blocks, and springs and torque to U-Bolts to 180 ft-lbs. SEE
PHOTO BELOW
7.
Install Fabtech shock part number FTS7266 Performance
Shocks or FTS81005 Dirt Logic Shocks (not included) with
the factory hardware and torque bolts to 65lbs.
8.
Rotate the E-Brake cable bracket so that it positions the cable
below the spring plate and attach to the plate with the factory
hardware. Once tightened, bend the bracket forward towards
the front of the truck. Locate the upper E-brake cable bracket
on the frame and bend it outward / down to give the cable
some more slack. SEE PHOTOS IN NEXT COLUMN
2011 configuration shown above
Bend bracket
forward to
give the cable
more slack