
ESTIMATING & ORDERING A ROOF
Step 3 (continued)
When determining the number of fasteners needed, follow this GENERAL rule:
♦
For every linear foot of roof panel ordered, you need 2 panel screws.
♦
Trim screws will be calculated separately.
(Always round screws up to the nearest 100 pcs.)
Remember this is a GENERAL rule; the actual amount may vary slightly for each different roof application. At this
point, your materials list for Diagram “A” should look like Sample “E”.
SAMPLE “E”
Section A
13 pcs. X 12’
Section B
13 pcs. X 12’
6 pcs.
CE-1 Eave Trim 5/12p
3 pcs.
RR-1 Ridge Cap 5/12p
6 pcs.
WG-1 Gable Trim
700 pcs.
#14 x 1” MP Panel Screws
200 pcs.
#14 x 1” MP Trim Screws
100 pcs.
#14 x 1.5” Trim Screws
4 Rolls
Butyl Sealant Tape
25 pcs.
Inside Closure
1 Roll (100’) Profile Vent for 5V
1 pc.
#3 Pipe Boot
You are now ready to order your new metal roof. If you have any questions, or need you materials list checked,
please contact your local FABRAL Distributor.
5V CRIMP
Order Form
Panels:
Color = ___________
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
______ pcs. @ ______ ft. ______ in.
Accessories:
______ pcs. Of Eave Flash ______ (flashing code)
______ pcs. Of Ridge Flash ______
______ pcs. Of Gable Flash ______
______ pcs. Of Sidewall Flash ______
______ pcs. Of Endwall Flash ______
______ pcs. Of Valley Flash ______
______ pcs. Of Transition Flash ______
______ pcs. Of Gambrel Flash ______
______ pcs. Of Peak Flash ______
______ pcs. Of J Channel ______
______ pcs. Of
#14 x 1” or 1½”
MP Painted Screws
______ pcs. Of Tube Caulk
______ pcs. Of Butyl Sealant Tape
______ pcs. 1 x 1 x 13.2’ Sealer Strip
Содержание 5V Crimp
Страница 1: ......