Страница 2: ...ements Three pairs will be required one for left edge one for right edge and one for centerline cuts Electric Nibblers or Metal Shears Used for general metal cutting such as cutting the panels in hip and valley areas Note Some installers prefer using a circular saw with a metal cutting abrasive blade This method may be faster but it has some drawbacks 1 Saw cut edges are jagged and unsightly and t...

Страница 3: ...and other power equipment Observe all manufacturer s safety recommendations Roof installation on windy days can be dangerous Avoid working with sheet metal products on windy days DELIVERY HANDLING STORAGE Always inspect the shipment upon delivery Inspect for damage and verify material quantities against the shipping list Note any damaged material or shortages at the time of delivery Handle panel b...

Страница 4: ...trations Additional Identification Ridge Hips Valleys Gables Etc ESTIMATING ORDERING A ROOF Step 2 From the diagram you completed in Step 1 you are now ready to develop your roofing panel cut list Each panel covers 24 so the only measurements you need are the distance from the eave to the ridge and the ridge length You can then determine the number of panels needed by dividing the ridge length by ...

Страница 5: ...orizontal run Use the Hip and Valley Chart below to ensure you order the correct panel length for hips and valleys For example Diagram 1A is a 4 12 pitch 4 12p According to the chart below we know each panel will be 25 shorter Since we are measuring from the longest point of the angle your first piece will be the same length as the full eave to ridge measurement and each piece after will be 25 sho...

Страница 6: ..._________ Gambrel __________ Skylight Chimney width _________ 5V CRIMP Estimating Guide Insert the total lineal feet of each condition into the equations below to determine required trim Eave ______ ft 9 5 _______pcs CE 1 EAVE Ridge ______ft 9 5 _______pcs RR 1 RIDGE CAP Gable ______ft 9 5 _______pcs WG 1 GABLE TRIM Sidewall and Endwall ______ft sidewall _______ft endwall 9 5 ________pcs ASW 1 TRI...

Страница 7: ...P x 4 5 ____ft VALLEY x 4 ____ft TRANSITION x 4 125 ____ft GAMBREL x 4 125 _____ft 40 roll ____ rolls Closures 1 x 1 x 13 2 Sealer Strip ____ ft HIP ____ VALLEY 6 5 ____ pcs Outside Closure ____ ft NONVENTED RIDGE x 1 pc ft ____ ft ENDWALL x 5 pcs ft ____ ft TRANSITION x 5 pcs ft ____ ft GAMBREL x 5 pcs ft ____ ft SKYLIGHT CHIMNEY x 5 pcs ft _____ pcs Inside Closures ____ ft EAVE x 5 ft ____ ft EN...

Страница 8: ...e now ready to order your new metal roof If you have any questions or need you materials list checked please contact your local FABRAL Distributor 5V CRIMP Order Form Panels Color ___________ ______ pcs ______ ft ______ in ______ pcs ______ ft ______ in ______ pcs ______ ft ______ in ______ pcs ______ ft ______ in ______ pcs ______ ft ______ in ______ pcs ______ ft ______ in ______ pcs ______ ft _...

Страница 9: ...eave Allow each consecutive course to overlap the previous one at least 4 Overlap the end a minimum of 6 when starting a new roll of underlayment Areas of underlayment that have been torn or cut should be replaced or repaired prior to installation of the metal roof See Illustration 1 below ILLUSTRATION 1 4 UNDER LAYMENT 6 4 Place an alignment line along the gable end where the first roof panel wil...

Страница 10: ...e up the gable edge from which you are starting This will insure that the first panel laid will be straight and square with the eave See Illustration 2 2 Before fastening the panel to the roof deck install the eave trim and tack in place with roofing nails 3 Once the first panel is in proper position secure it to the roof deck 14 x 1 mill point screws according to the standard fastening pattern 4 ...

Страница 11: ...in conjunction with the Home Legend drawing to help you understand placement and proper installation 5V CRIMP FASTENERS Fasteners Description Use Approx 2 Per foot Of Panel Plus Trim 14 x 1 Mill Point Screw Panels and Trim Approx 2 per foot Of panel Plus Trim 14 x 1 Mill Point Screw Panels and Trim Note either 1 or 1 screws can be used to fasten panels Listed are the fasteners recommended for the ...

Страница 12: ... of trims shown on following pages EAVE CE 1 MONOSLOPE PEAK CAP CP 1 RIDGE HIP RR 1 GABLE WG 1 VALLEY RV 2 SIDEWALL ENDWALL ASW 1 TRANSITION AT 1 GAMBREL AT 2 ENDWALL GABLE RAKE EAVE PIPE PENETRATION VALLEY RIDGE PEAK SIDEWALL GABLE RAKE HIP ...

Страница 13: ...5V Crimp Trim Enlargements EAVE CE 1 MONOSLOPE PEAK CAP CP 1 GABLE WG 1 VALLEY RV 2 RIDGE HIP RR 1 SIDEWALL ENDWALL ASW 1 TRANSITION AT 1 GAMBREL AT 2 ...

Страница 14: ...er of 36 roofing underlayment in the center line of the valley with 18 of underlayment on each side of the valley 4 When valley flashing is overlapped a minimum of 6 of lap is recommended with sealant applied between the pieces of valley trim at the endlap 5 Install Butyl Sealant Tape and 1x1x13 Sealer Strip parallel to the valley flashing as shown above 6 Field cut the roofing panels holding back...

Страница 15: ... LONG FASTENER AT EVERY RIB 12 O C 5V ROOF PANEL ROOF STRUCTURE 30 ROOFING FELT RIDGE CAP RR 1 PROFILE VENT Notes 1 Plywood should be held back or cut back 1 from each side of the ridge 2 Attach the panels checking the 1 minimum overhang at the eave 3 The gable flashing must be installed prior to the ridge installation 4 Mark edge of Ridge Cap on both sides of the peak Unroll Profile Vent and pres...

Страница 16: ...wall is needed a 6 minimum overlap is recommended with sealant between the lap SIDEWALL DETAIL BUTYL SEALANT 5V ROOF PANEL 30 ROOFING FELT ROOF SHEATHING 14 x 1 1 2 SCREW 9 C C ASW 1 SIDING FASTENER Notes 1 The sidewall flashing is placed over the panel rib and placed behind the siding as shown 2 When the panel rib seam does not end up next to the wall cut the panel and bend a 1 return up the wall...

Страница 17: ...n rib of the bottom transition panels 4 Install closures sealants and top panels as shown above PIPE FLASHING SCREWS SPACED 2 TO 3 MAX AROUND BASE TO SECURE PLYWOOD DECK OPTIONAL SILICONE SEALANT AROUND CUT OF BOOT BUTYL SEALANT TAPE UNDER BASE OF PIPE BOOT ROOF PANEL PIPE BOOT VENTILATION PIPE Notes 1 Cut the hole in the flashing 20 smaller than the pipe diameter 2 Slide the flashing down the pip...

Страница 18: ... slot in the two uphill corners of the 5V Crimp panels slightly wider than 2 so the uphill flashing can slide through the two slots SKYLIGHT FLASHING PREPARATION Detail A 2 1 REMOVE THIS MATERIAL FOLD HERE 90 DEGREE CUT HERE Detail C 1 CUT HERE REMOVE THIS MATERIAL FOLD HERE 90 DEGREE REMOVE HEM TO FOLD LINE Notes 1 Trim both ends of the uphill and downhill sides of the skylight flashing as indica...

Страница 19: ... ends SKYLIGHT DETAIL C DETAIL B SLOPE DETAIL A SKYLIGHT FLASHING SIDE 14 WOODSCREW 12 O C 14 WOODGRIP WOODSCREW 4 O C TAPE SEALANT FIELD FORMED SIDE FLASHING Notes In reference to details A B and C SKYLIGHT TOP FLASH SUGGESTED SHAPE 45 8 12 SKYLIGHT BOTTOM FLASH SUGGESTED SHAPE 4 3 16 4 3 16 SKYLIGHT DOWNHILL 14x 1 1 2 SCREW 12 O C PLYWOOD DECK 14 MILL POINT SCREW 4 O C CLOSURE W BUTYL SEALANT TO...

Страница 20: ... AL FLASHING CHIMNEY FLASHING UPHILL SIDE ROOF SHEATING 14x1 OR1 1 2 SCREW FASTENER 6 O C MAX BATT INSULATION SAW CUT REGLET 1 2 1 DEEP BLOW OUT DUST FILL WITH SIKAFLEX SEALANT SET FLASH FASTEN WITH COMPATIBLE MASONRY ANCHOR ROOF PANEL INSIDE CLOSURE SEALANT TAPE TOP BOTTOM OF CLOSURE 5 MIN 1 2 PLYWOOD 1 2 RIGID INSULATION CUSTOM DIVERTER FLASH CONTINUE SUCH THAT THE DIVERTER AND VALLEY FLASH OVER...

Страница 21: ...anufacturing Facilities Gridley Plant Rt 24 West Gridley IL 61744 800 451 3974 Fax 800 289 3383 Marshfield Plant 1820 East 26th Street Marshfield WI 76063 800 528 0878 Fax 715 387 2424 Jackson Plant 308 Alabama Blvd Jackson GA 30233 800 884 4484 Fax 800 765 4484 Cedar City Plant 2402 Industry Way Cedar City UT 84720 800 432 2725 Fax 800 632 2725 Rathdrum Plant 658 Boekel Road Rathdrum ID 83858 888...