Installation
Recommended Fixing Dimensions - Fig. 2
Fig. 3
Fig. 4
Fig. 5
Mark the bottom hole position (see Fig. 5), remove the heater
ensuring that the bottom fixing bracket is rotated up.
Drill and fit wall plug.
Refit the heater to the wall fixing bracket (i.e. follow steps as
in Fig. 4 a,b,c and d above) and rotate the bottom fixing
bracket down again and use the screw provided to
permanently fix the heater in place.
The heater should not be connected until the instruction leaflet
is read fully.
Do not connect appliance until properly fixed to the wall
and the Instruction leaflet is read fully.
This model is designed to be permanently fixed to a wall at a
minimum height of 300mm.
The wall bracket must be fitted horizontally and the cable
routed to the bottom right of the heater as in Fig 1.
A height of 600mm from bottom of heater to floor is
recommended for optimum viewing of fuel bed (see Fig. 2
for recommended fixing dimensions).
For optimum viewing mark the top
four
screw fixing positions
on wall in accordance with the recommended fixing
dimensions - see Fig. 2.
Drill holes with a 6mm drill bit.
Fix the wall bracket using the
four
plugs and screws provided - see Fig 3.
Carefully lift the heater up ensuring that the top rear ledge of
heater engages the wall bracket and is sitting centrally
positioned. - see Fig 4 (b).
Rotate the bottom fixing bracket down. - see Fig 4 (c).
Gently bring the heater level with the wall. - see Fig 4 (d).
wall
plugs
screws
wall
fixing
bracket
8
566
240
600
1158
558
480
outline of
wall fire
outline of wall
fixing bracket
mark hole
centre with
pencil
wall
bracket
ledge
ensure ledge
at back of
fire engages
wall bracket
Detail ’1’
wall bracket
see
detail ’1’
a
lift appliance
above wall
fixing bracket
rotate bottom
fixing bracket
down from its
transit position
c
d
bring level
with wall
slide down over
bracket, ensure
that ledge of
appliance engages
behind wall
bracket and is
central
b