Before proceeding with the installation of the 
fire Install the side and front glass of the fire 

to check the squareness (See chapter 6) 
With a correct squareness of the unit, all 

glass panel will match correctly to each other 
 

Note: remove all glass panels after this check 
and proceed the installation work.  

4.6

 

Mounting the flue materials.  

 

In case of a wall or roof terminal, the 
hole must be at least 5 mm bigger 

than the diameter of the flue 
material. 

 

Horizontal parts must be installed at a 
(3 degree) slope up away  the 

appliance. 

 

Build up the system from the 

appliance. If this is not possible, you 
should make use of a adjustable pipe  

 

For fitting the  system  a ½ metre  
cut-down pipe should be used. Make 
sure the inner pipe is always 2 cm 

longer than the outer pipe. Wall and 
roof terminal are also shortened. 

These parts must be secured with a 
self-tapping screw. 

 

Do not insulate but ventilate build-in 
flue material  (approx.100cm2) 

4.7

 

Building a chimney breast. 

Before constructing the chimney breast we 

advise you to perform a function test with the 
appliance as described in chapter 7 “checking 

the installation” 

4.8

 

Chimney breast 

 

Construct the chimney breast from 
non-combustible material in 
combination with metal profiles or of 

brickwork / aerated concrete bricks. 

 

Take the grills and the service panel 

into account. ( see fig. 1.1 and 1.2).  
Place a protective shield made of 

non-combustible material above the 
grills (see fig 1.1 A) . 

 

Always use a lintel if the chimney 
breast is constructed of brickwork. 

These should not rest  onto the build-
in frame. 

 

The chimney construction may not 
resting on the build-in frame  
 

 
 

 
 

 
 

5

 

Placing the decorative material 

 

It is not allowed to add different or more 

materials to the combustion chamber. 
Always keep the pilot burner and the second 

thermocouple free from decorative material! 
(See fig. 4.1 A up to 4.3 A) 

Do not toss all the decorative material onto 
the burner all at once, it can be obstructed 

by dust particles. 

5.1

 

 

Imitation logs 

 

Place a number of the chips onto the 
burner and on the cover plate  

 

Place the imitation logs according to 
instructions. (see fig. 4.1 or imitation 

logs instruction card supplied)  

 

Divide the remainder of the chips 

over the burner and the cover plate . 
Avoid a thick layer onto the burner, 
this has a negative effect on the fire 

image. 

 

Ignite the pilot and main burner 

according to the instructions in the 
user’s manual. Assess whether the 

flame division is correct. If necessary, 
move the chips until there is a proper 

division of flames. 

 

Place the glass and check the fire 

image. 

5.2

 

Pebbles / Grey stone  

 

Place the pebbles over the burner and 
the bottom. Spread the pebbles 
evenly to a double layer. The surface 

of the pebbles may be very slightly 
elevated from the burner  (see fig.4.2 

and 4.3) 

 

Place the glass and check the flame 

picture into the appliance  

 

6

 

Installation front and side glass 

 
Take all glass part out the packing and use 
the suction discs for placing the glass

, t

he 

side glass need to be install first  
 

Note: before placing the glass remove all 
fingerprints on the glass, these will be burned 

into it once the appliance is used. 

6.1

 

 

Placing  side glass  

 

Slide the glass between the groove  
and built-in frame (See fig.3.1) 

 

(Next steps all in one move) 
keep the glass tilted slightly to the 

side (See fig.3.2). 

Содержание Respect OC

Страница 1: ...Respect OC 40011335 1235 Installation manual ENG ENG ...

Страница 2: ...1 L 1 1 1 2 1 3 1 4 2 1 2 2 2 3 A A A ...

Страница 3: ...2 L 2 4 2 5 2 6 A B A C B ...

Страница 4: ...3 L 3 1 3 2 3 3 3 4 3 5 3 6 ...

Страница 5: ...4 L 3 7 A B ...

Страница 6: ...5 L 4 1 4 2 4 3 A A A A A A ...

Страница 7: ...the fire run on maximum setting for several hours so that the lacquer coating will have an opportunity to set and possible vapours released can be safely removed by ventilation We advise you to be outside the room as much as possible during this process Please note that all transport packaging should be removed children or pets should not be present in the room 3 Installation requirements 3 1 The ...

Страница 8: ...ame if necessary and the glass and take the separately wrapped parts out of the appliance Prepare the gas connection to the gas control valve 4 4 Moving the appliance If necessary the upper parts of the appliance can be taken of this gives a minimum dimension of the appliance 780mm then the appliance can be transported on the back side see fig 2 1 It is only allowed to remove the transport plate a...

Страница 9: ...build in frame The chimney construction may not resting on the build in frame 5 Placing the decorative material It is not allowed to add different or more materials to the combustion chamber Always keep the pilot burner and the second thermocouple free from decorative material See fig 4 1 A up to 4 3 A Do not toss all the decorative material onto the burner all at once it can be obstructed by dust...

Страница 10: ...is on at full gas mark and when it is on the pilot light If the inlet pressure is too high you are not permitted to connect the appliance Measuring the burner pressure Only perform this measurement if the inlet pressure is correct Open the pressure gauge nipple A see fig 1 4 a few turns and connect a pressure gauge hose to the gas control valve The pressure must correspond with the value indicated...

Страница 11: ...ters 9 Annual maintenance 9 1 Service and cleaning Check and clean if necessary after checking o The pilot light o The burner o The combustion chamber o The glass o The logs for possible fractures o The outlet 9 2 Replace o If necessary the chips embers o in an LPG flat burner replace the burner sheet 9 3 Cleaning the glass Most of the deposits can be removed with a dry cloth You can use ceramic h...

Страница 12: ...s of the elements H J L M P and R fig 12 1 and 12 2 11 5 90 bends in the horizontal direction Only bends in the horizontal direction Indicated as I K and Q fig 12 1 12 2 and 12 3 11 6 45 of 30 bends in the horizontal direction Only bends in the horizontal direction 11 7 90 bends from vertical to horizontal direction 90 bends from vertical to horizontal direction or reversed Indicated as G O and S ...

Страница 13: ...x x x x x 13 70 2 x x x x x x x x 14 70 2 x x x x x x x x 15 80 2 x x x x x x x x 16 80 2 x x x x x x x x 17 80 2 x x x x x x x x 18 80 2 x x x x x x x x 19 80 2 x x x x x x x x 20 80 2 x x x x x x x x 21 80 2 x x x x x x x x 22 80 2 x x x x x x x x 23 80 2 x x x x x x x x 24 80 2 x x x x x x x x 25 80 2 x x x x x x x x 26 80 2 x x x x x x x x 27 80 2 x x x x x x x x 28 80 2 x x x x x x x x 29 80 ...

Страница 14: ...65 4 13 85 4 80 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 14 85 4 85 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 15 85 4 85 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 16 85 4 85 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 17 85 4 85 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 18 85 4 85 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 19 85 4 85 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 20 85 4 85 4 80 4 80 4 80 4 70 4 70 4 70 4 65 4 21 85 4 85 ...

Страница 15: ...14 L 12 Example fig 12 1 fig 12 2 fig 12 3 ...

Страница 16: ...om 2M or more 2 Bends 90 0 1 Bends 45 30 of 15 0 2 Roof terminal 1 Wall terminal 0 Total Vertical Height TVH measured height rounded value meter meter Total Horizontal Length THL calculate Part number x value result rounded value Total length in meters x 1 90 bends vertical to horizontal x 0 4 45 bends vertical to horizontal x 0 2 90 bends in the horizontal direction x 1 5 45 bends horizontal dire...

Страница 17: ...olution Start length to low see for the minimum length in the top row of the table Results Restrictor size Found value for the comma mm Extra information Found value behind the comma Mark which is applied Install the Air restrictor plate see installation manual 0 1 Install adapter 100 150 direct on top the fire 0 2 In case of wall terminal install adapter 100 150 before the last bend in case of ro...

Страница 18: ...bar gr h 1140 970 Burner pressure at full mark mbar 10 23 0 28 Injector main burner mm 7x0 89 7x1 09 7x0 54 7x0 61 7x0 54 7x0 61 Reduced input restraint mb Adjustable 4 4 Adjustable 14 3 Adjustable 17 Pilot assembly SIT 145 SIT 145 SIT 145 Code 36 23 23 Diameter inlet outlet mm 200 130 200 130 200 130 Gas control valve GV60 GV60 GV60 Gas connection 3 8 3 8 3 8 Electrical connection V 220 220 220 B...

Страница 19: ...18 L 15 Dimensions ...

Страница 20: ...19 L ...

Страница 21: ...20 L ...

Страница 22: ...21 L ...

Страница 23: ...22 L ...

Страница 24: ...www faber nl info faber nl Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen T 31 0 513 656500 F 31 0 513 656501 Dealer info ...

Отзывы: