3.4  

Terminals 

The combined supply and discharge can be done both via wall or 

through the roof or through an existing chimney. Verify if the 

position of the terminal meets the local regulations regarding 

ventilation openings.

The flue outlet can end on an external wall or a roof. Check 

whether the outlet desired by you complies with local requirements 

concerning good function and ventilation systems.

Please note:

For a proper functioning the terminal should be at least 0,5m. away 

from:

• 

Corners of the building

• 

Roof overhangs and balconies

• 

Eaves (with the exception of the roof ridge, see Chapter 15)

3.4.1 

C11, wall terminal

For a facade or wall outlet use a wall terminal (see fig. 1.9 C11).

Depending on the calculation this can be a diameter of 

130/200mm or 100/150mm.

3.4.2 

C31, roof terminal

For a flat or pits roof outlet use a long roof outlet with a diameter of 

100/150mm (see fig. 1.9 C31).

3.4.3 

C91, existing chimney

For an existing chimney use the short chimney outlet with a 

diameter of 100/150mm (see fig. 1.9 C91).

In this case the existing chimney acts as air inlet an inserted flexible 

stainless steel pipe discharges the flue gas. The top and the bottom 

should be airtight.

Depending on the calculated outlet diameter, use a flexible 

stainless steel tube of Ø100mm or Ø130mm with CE marking 

for 600°C.

>   Please note:

The minimum chimney diameter for a 130mm flexible stainless 

steel pipe must 200x200mm. and for a 100mm flexible stainless 

steel pipe 150x150mm.

3.5  

Existing chimney

You can also connect to an existing fireplace chimney. The existing 

chimney functions then as air supply and a flexible stainless steel 

tube drawn through the chimney carries the flue gases. The flexible 

stainless steel tube of Ø100mm must have a CE mark have up to 

600°C.

The chimney must have the following conditions:

• 

The channel of the chimney must be at least 150x150mm.

• 

There should be no more than one device on a chimney.

• 

The chimney must be in good condition:

 

-  

no leakage

 

well cleaned

For more information about connections to existing chimneys, ask 

the installation manual “chimney connection set”. 

4 Preparation and installation 

 instructions

4.1  

Gas connection

The gas connection must comply with the applicable local 

standards.

We advise using a Ø 15mm gas connection directly from the gas 

meter to the appliance, with a shut-off valve in the proximity of the 

appliance, which must always be freely accessible.

Position the gas connection so that it is easily accessible at all 

times for service, and that the burner unit can be disassembled. 

4.2  

Electrical connection

The power supply must comply with the applicable local standards.

A wall socket 230VAC/50Hz must be installed near the fire.

For power supply make use of the included plug adapter.

See fig 2.8 or 2.9 for the wiring diagram of this connection and the 

LED Symbio module.

 

A = plug adapter

 

B = control unit

 

C = receiver

 

D = LED Symbio module

 

E = control block

 

F = magnet valve

 

G = 2nd thermocouple

4.2.1 

Smart-Home installation

You can connect the control unit to the receiver with an external 

source, such as a Domotica home automation system, using the 

5-wire pin connector. 

(Part G60-ZCE/1000, art.no.: 06022950). The total length of the 

cable may not exceed 8m. Signal relay (gold-plated contacts) or 

opto-couples are recommended! 

4.2.2 

Faber ITC (Intelligent Technical Controller)

The ITC gives you more options, such as ECO control, control, 

error messages, maintenance advice and such.

For further information see the ”ITC” user manual.

4.3  

Preparing the fire

• 

Remove the fire from its packaging. Ensure that the gas    

 

supply pipes under the appliance are not damaged. 

• 

Remove frame and glass and take the packaged parts from  

 

the fire.

• 

Store frame and glass in a safe place.

• 

Prepare the gas connection on the regulator.

4.4  

Positioning the fire

Take the installation requirements into account (see Chapter 3). 

Place the appliance in the right position and set the height with the 

(optional) leg levelers.

Height adjustment and levelling of the appliance (see point C, fig. 

1.1).

Rough height adjustment:

 

With the extendable (optional) leg.

Fine adjustment:

 

With the adjustable feet.

Содержание MatriX 1050 Series

Страница 1: ...MatriX 1050 serie 40011616 1714 MatriX 1050 ENG...

Страница 2: ...I n s t a l l a t i o n I n s t r u c t i o n s 2 1 0 1 2 1 1 1 3...

Страница 3: ...I n s t a l l a t i o n I n s t r u c t i o n s 3 1 4 1 5 1 6 1 7 1 8 D E...

Страница 4: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 2 0 2 1 F G 1 9...

Страница 5: ...I n s t a l l a t i o n I n s t r u c t i o n s 5 2 2 2 3 2 4 H H I I...

Страница 6: ...I n s t a l l a t i o n I n s t r u c t i o n s 6 J L K H H 2 7 2 5 2 6...

Страница 7: ...I n s t a l l a t i o n I n s t r u c t i o n s 7 2 9 2 8...

Страница 8: ...I n s t a l l a t i o n I n s t r u c t i o n s 8 B B A C 3 0 3 1 1 2 3 3 1 C 2 3 4 3 3 2 3 3...

Страница 9: ...I n s t a l l a t i o n I n s t r u c t i o n s 9 3 4 1 2 3 5...

Страница 10: ...I n s t a l l a t i o n I n s t r u c t i o n s 1 0 4 0 4 1 4 2...

Страница 11: ...I n s t a l l a t i o n I n s t r u c t i o n s 1 1 4 3 4 4 4 5...

Страница 12: ...I n s t a l l a t i o n I n s t r u c t i o n s 1 2 4 6...

Страница 13: ...rials and carpeted floors etc are attracted These parts can settle as soot on cold surfaces Therefore do not light the fire shortly after installation Light the fire for the first time and run for sev...

Страница 14: ...mney must be in good condition no leakage well cleaned For more information about connections to existing chimneys ask the installation manual chimney connection set 4 Preparation and installation ins...

Страница 15: ...stance profile fig 2 4 J upper side flange combustion chamber fig 2 5 K distance holder glass support fig 2 6 L distance holder glass support fig 2 6 Please note Ensure that the fire is not load beari...

Страница 16: ...nd pipes for gas leakage 7 3 Checking the burner pressure and primary pressure Check that the burner pressure and primary pressure match with the information listed in the manual Chapter 14 Technical...

Страница 17: ...table we work with start length STL total vertical height TVH and total horizontal length THL Start length STL This is the first part that is placed on the fire and represents a certain value fig 12...

Страница 18: ...2 0 2 x x x x x x x x 11 60 2 30 2 0 2 x x x x x x x x 12 60 2 30 2 0 2 x x x x x x x x 13 70 2 30 2 0 2 x x x x x x x x 14 70 2 30 2 30 2 0 2 x x x x x x x 15 70 2 30 2 30 2 0 2 x x x x x x x 16 70 2...

Страница 19: ...40 4 x x 10 50 4 50 3 50 4 50 4 50 4 45 4 45 4 x x 11 60 4 60 3 60 4 50 4 50 4 50 4 45 4 x x 12 60 4 60 3 60 4 60 4 50 4 50 4 50 4 x x 13 60 4 60 3 60 4 60 4 60 4 50 4 50 4 x x 14 70 4 70 3 60 4 60 4...

Страница 20: ...0 4 x x 10 50 4 50 3 50 4 50 4 50 4 45 4 45 4 x x 11 60 4 60 3 60 4 50 4 50 4 50 4 45 4 x x 12 60 4 60 3 60 4 60 4 50 4 50 4 50 4 x x 13 60 4 60 3 60 4 60 4 60 4 50 4 50 4 x x 14 70 4 70 3 60 4 60 4 6...

Страница 21: ...4 60 4 60 4 60 4 60 4 60 4 x x x x 11 70 4 70 4 70 4 60 4 60 4 60 4 60 4 x x x x 12 70 4 70 4 70 4 70 4 60 4 60 4 60 4 x x x x 13 70 4 70 4 70 4 70 4 70 4 60 4 60 4 x x x x 14 70 4 70 4 70 4 70 4 70 4...

Страница 22: ...60 4 60 4 60 4 60 4 x x x x 11 70 4 70 4 70 4 60 4 60 4 60 4 60 4 x x x x 12 70 4 70 4 70 4 70 4 60 4 60 4 60 4 x x x x 13 70 4 70 4 70 4 70 4 70 4 60 4 60 4 x x x x 14 70 4 70 4 70 4 70 4 70 4 70 4...

Страница 23: ...I n s t a l l a t i o n I n s t r u c t i o n s 12 Examples flue materials fig 12 1 fig 12 2 fig 12 3 2 3...

Страница 24: ...ntal direction x 1 5 45 Bend in horizontal direction x 1 flue pipes at an angle in meters x 0 7 meter Value Starter length STL First part on top of the appliance Flue length from 0 1m till 0 45m Flue...

Страница 25: ...er just before the terminal Wall terminal 130 200 0 4 Restrictor size Value for the comma Extra information Value behind the comma Search in the table at TVH and THL and enter the value that is found...

Страница 26: ...r h 720 710 Burner pressure at full mark mbar 10 5 21 28 4 Injector main burner mm 4x 1 3 1x 1 6 1x 0 8 4x 0 9 1x 0 8 4x 0 9 Reduced input restraint mm adjustable adjustable adjustable Pilot flame SIT...

Страница 27: ...13 mbar gr h 860 830 Burner pressure at full mark mbar 13 8 20 5 27 1 Injector main burner mm 4x 1 3 1x 1 6 5x 0 9 5x 0 9 Reduced input restraint mm 2 1 1 6 1 6 Pilot flame SIT145 SIT145 SIT145 Code p...

Страница 28: ...ets against over each other 1000 L Distance between two roof outlets 450 M Two roof outlets above each other on a pitched roof 1000 N Two gable outlets next to each other 1000 Short roof terminal Only...

Страница 29: ...t of a small piece from the sparking plug Tie wraps removed Cable is free from any metal parts 4x 1 5V AA Alkaline Thermocouple circuit is interrupted check 8 wire cable from receiver to the gas valve...

Страница 30: ...ot burner is leaking Gasket between burner unit is leaking Glass seal is leaking Flue parts aren t 100 connected check flue system Replace batteries in the receiver Check the distance from thermocoupl...

Страница 31: ...ulty parts RESET the receiver Gas vlave broken poor or loose contact Short circuit in wiring Install a ground cable from the gas valve to the appliance Optional Step burner function can be turned ON a...

Страница 32: ...I n s t a l l a t i o n I n s t r u c t i o n s 3 2 17 Dimensional drawings 17 1 MatriX 1050 500 I...

Страница 33: ...I n s t a l l a t i o n I n s t r u c t i o n s 3 3 17 2 MatriX 1050 500 IIL...

Страница 34: ...I n s t a l l a t i o n I n s t r u c t i o n s 3 4 17 3 MatriX 1050 500 IIR...

Страница 35: ...I n s t a l l a t i o n I n s t r u c t i o n s 3 5 17 4 MatriX 1050 500 III...

Страница 36: ...I n s t a l l a t i o n I n s t r u c t i o n s 17 5 MatriX 1050 650 I 3 6...

Страница 37: ...I n s t a l l a t i o n I n s t r u c t i o n s 17 6 MatriX 1050 650 IIL 3 7...

Страница 38: ...I n s t a l l a t i o n I n s t r u c t i o n s 17 7 MatriX 1050 650 IIR 3 8...

Страница 39: ...I n s t a l l a t i o n I n s t r u c t i o n s 17 8 MatriX 1050 650 III 3 9...

Страница 40: ...I n s t a l l a t i o n I n s t r u c t i o n s 17 9 Wall bracket 1050 500 4 0...

Страница 41: ...I n s t a l l a t i o n I n s t r u c t i o n s 17 9 Wall bracket 1050 650 4 1...

Страница 42: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 2 17 10 Remote acces door...

Страница 43: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 3 17 11 Ventilation grid...

Страница 44: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 4 17 12 Adjustable feet...

Страница 45: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 5...

Страница 46: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 6...

Страница 47: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 7...

Страница 48: ...I n s t a l l a t i o n I n s t r u c t i o n s 4 8 www faber nl info faber nl Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen Dealerinfo...

Отзывы: