>
>
>
>
17
it. Any under floor vents or openings within the builders opening
should be sealed off.Slide the debris catcher on a flexible pipe;
4)
The floor must be sufficiently flat to enable the bottom of the front
surround and door to be aligned horizontally;
5)
The front face of the fireplace should be reasonably flat over the
area covered by the firebox to ensure good sealing;
6)
Make the gas connection according to the instructions (also see gas
connection, chapter 4.1);
7)
Connect the inner collar of the vent connector with one end of the
(flexible) flue pipe. If you use a debris catcher, connect the flexible
pipe to the vent connector. The flue connector outer collar is for
connection to a 125 mm (5 inch) internal diameter pipe or liner. The
inner collar is for connection to a 100 mm internal pipe or liner (see
fig. 11);
8)
Slide the pipe (with debris catcher, when used) and part of the vent
connector through the hole in the firebox;
9)
Slide the clamping plate, with the lip upward, under the vent
connector so that it stays in place;
10)
Slide the combustion chamber in the firebox;
fig. 11
Содержание FEELING
Страница 2: ...2 ...
Страница 12: ...12 ...
Страница 36: ...36 USER GUIDE ...
Страница 45: ... 45 Fig 33 Uultra Sound Receiver back ...
Страница 48: ...48 Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen T 31 0 513 656500 F 31 0 513 656501 ...