background image

M a n u a l   e - M a t r i X   8 0 0

9

4.2  Placing the fire

 

For a proper functioning of the fire, always ensure that the fire is levelled.

 

Use the adjustable feet or the distance holder at the backside of the fire. See fig. 1.2a..

 

4.2.1  Floor standing

 

 

Place the fire at the right position and fix it on the wall see fig. 1.1.

 

4.2.2  Hanging on the wall

 

 

The fire can be hanging on the wall with the optional wall bracket see fig. 1.2a, 1.2b and    

 

 

dimensional drawing in Chapter 13.6.

4.3  4.3   Installation and finishing (see fig. 1.0)
 

4.3.1  With cover strip “A”

           

Build the false chimney breast or plateau against distance holder B.

 

4.3.2  Without cover strip “A”

           

Remove distance holders B from the fire. Build the false chimney breast or plateau against    

 

 

distance holder C. 

4.4  Control box (see fig. 4.0)

 

!! Fix the Control box at an accessible location behind the service door. See Chapter 13.5 and 13.7.

 

4.4.1  Electric connection

 

• 

Use the supplied extension cable to connect the Control box to the Engine see fig. 4.0-B.

 

• 

Lead the DC cable, inside the Engine, to the Control box and connect it see fig. 4.0-A.

 

 

- Max. cable length from the center of the fire to the left 1,5m.

 

 

- Max. cable length from the center of the fire to the right 1,0m.

 

• 

Connect the supplied mains lead see fig 4.0-C.

 

If desired, a 2m extension set is available.

 

4.4.2  Water connection

 

This appliance is equipped with the following overflow protections:

 

 

Electromechanical valve in the Control box which is sent by an overflow sensor in the   

 

 

 

water tank.

 

 

Absorption valve in the Engine that kicks in when the water sump has an unexpectedly  

 

 

 

overflow see fig. 5.0-K.

 

• 

Connect all parts according flow diagram see fig. 5.0.

 

 

A = mains water  

 

F = mesh filter 

1 = safety clips (11x)

 

 

B = ½ or ¾” connector 

G = in-line filter 

2 = in-line filter brackets (2x)

 

 

C = ¼” 1m pipe 

 

H = control box 

3 = elbows (4x)

 

 

D = ball valve 

 

I = ¼” 1,5m pipe

 

 

E = to be cut from ¼” 1m pipe     J = e-MatriX Engine

 

• 

Place the water filters at an accessible location in correct alignment, there’s a “flow” direction  

 

 

marking on both filters and Control box. See fig. 4.0.

 

!! Carry out a performance test see Chapter 9 and check all connections for water leakage before   

 

placing the fuel bed and front glass.

Содержание e-MatriX 800-I

Страница 1: ...40011677 1839 Manual e MatriX 800 I II III ENG Manual e MatriX 800 I II III ENG...

Страница 2: ...2 M a n u a l e M a t r i X 8 0 0 Registration plate...

Страница 3: ...M a n u a l e M a t r i X 8 0 0 3 1 0 1 1 1 2a 1 2b...

Страница 4: ...4 M a n u a l e M a t r i X 8 0 0 2 0c 2 1a 2 0b 2 1b 2 0a...

Страница 5: ...5 M a n u a l e M a t r i X 8 0 0 2 1c 3 0 2 2 3 1 4 0 4 2 4 3 4 1...

Страница 6: ...M a n u a l e M a t r i X 8 0 0 6 5 0...

Страница 7: ...M a n u a l e M a t r i X 8 0 0 7 6 0 7 0 7 1 7 2 7 3 7 4 8 0...

Страница 8: ...2 and EN60555 3 these cover the essential requirements of EEC Directives 2006 95 EC and 2004 108 EC This declaration is invalid if changes are made to the fire 2 Safety instructions Do not use outdoo...

Страница 9: ...gine see fig 4 0 B Lead the DC cable inside the Engine to the Control box and connect it see fig 4 0 A Max cable length from the center of the fire to the left 1 5m Max cable length from the center of...

Страница 10: ...y it s not necessary to remove the side glass First remove the front glass see Chapter 5 1 or 5 2 Place a suction cup and remove the side glass see fig 2 2 For replacing the glasses repeat the steps i...

Страница 11: ...valves are open and turn on the water supply Switch the fire on by pressing the mains switch to the ON position and pressing the button see Chapter 8 1 and 8 2 o If the water level is high enough the...

Страница 12: ...ity and or the running hours and therefore can differ from the above mentioned 10 1 1 Cleaning water sump Always press the mains switch to the OFF position and disconnect the power supply see fig 4 1...

Страница 13: ...t the transducer upwards out of its holder Place the new transducers and repeat the steps above in reverse order Please take note that the transducers will not block the opening of the cones 10 1 4 Cl...

Страница 14: ...ter level too high Check the electromechanical valve in the Control box Switch the mains switch of the Control box to the OFF position and heck all connections on water leakage Close the ball valves a...

Страница 15: ...M a n u a l e M a t r i X 8 0 0 1 5 13 Dimensional Drawings 13 1 e MatriX 800x500 650 I...

Страница 16: ...M a n u a l e M a t r i X 8 0 0 1 6 13 2 e MatriX 800x500 650 IIL...

Страница 17: ...M a n u a l e M a t r i X 8 0 0 1 7 13 3 e MatriX 800x500 650 IIR...

Страница 18: ...M a n u a l e M a t r i X 8 0 0 1 8 13 4 e MatriX 800x500 650 III...

Страница 19: ...M a n u a l e M a t r i X 8 0 0 1 9 13 5 Control box...

Страница 20: ...M a n u a l e M a t r i X 8 0 0 2 0 13 6 Wall bracket...

Страница 21: ...M a n u a l e M a t r i X 8 0 0 2 1 13 7 Service door...

Страница 22: ...M a n u a l e M a t r i X 8 0 0 2 2...

Страница 23: ...M a n u a l e M a t r i X 8 0 0 2 3...

Страница 24: ...2 4 www faber nl info faber nl Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen T 31 0 513 656500 F 31 0 513 656501...

Отзывы: