L
5 <
<
<
<
ceiling constructions. And observe
sufficient distance.
Make sure that the concentric flue
materials are bracketed every 2
metres when they have an extended
length, so that the weight of the flue
material is not resting on the
appliance itself.
You may never start with a cut-down
concentric pipe directly on to the
appliance.
3.4
terminals
The flue outlet can end on an external wall or
a roof . Check whether the outlet desired by
you complies with local requirements
concerning good function and ventilation
systems .
For a proper functioning the terminal should
be at least 0.5 m. away from:
Corners of the building.
Roof overhangs and balconies.
Eaves (with the exception of the roof
ridge).
4
Preparation and Installation
instructions
4.1
Gas connection
The gas connection must comply with locally
valid standards.
We advise Pipe work from the meter to the
appliance must be of adequate size., with
near the appliance a gas isolater tap that
should always be accessible. Place the gas
connection in such a way that this is easily
accessible, and that before service, the
burner unit can be disconnected at all times.
4.2
Electric connection
If an adapter is used for the power supply,
then a wall socket 230VAC – 50Hz must be
mounted in the close neighbourhood of the
hearth.
4.3
Preparation of the appliance
Remove the packaging of the
appliance . Make sure the gas pipes
underneath the appliance are not
damaged.
Clear a safe space to store the frame
and the glass.
Remove the frame , (if necessary) and
the glass and take the separately
wrapped parts out of the appliance
Prepare the gas connection to the gas
control valve.
4.4
Placing the appliance
Take the installation requirements into
account (see chapter 3)
Place the appliance into the proper position
and if necessary, adjust the height with the
adjustable legs.
Adjusting the height and leveling the hearth
with a spirit level.(see fig. 1.3)
Rough height adjustment:
o
with the extending legs,
or the long additional
legs.
Accurate:
o
with the rotating
adjustable legs.
4.5
Mounting the flue materials
In case of a wall or roof terminal, the
hole must be at least 5 mm bigger
than the diameter of the flue
material.
Horizontal parts must be installed at a
(3 degree) slope up away the
appliance.
Build up the system from the
appliance. If this is not possible, you
should make use of a adjustable pipe
.
For fitting the system a ½ metre
cut-down pipe should be used. Make
sure the inner pipe is always 2 cm
longer than the outer pipe. Wall and
roof terminal are also shortened.
These parts must be secured with a
self tapping screw.
Do not insulate but ventilate bild-in
flue material (approx.100cm2)
4.6
Building a chimney breast.
Before constructing the chimney breast we
advise you to perform a function test with the
appliance as described in chapter 7 “checking
the installation”
4.7
Chimney breast
Construct the chimney breast from
non-combustible material in
combination with metal profiles or of
brickwork / aerated concrete bricks.
Содержание Aspect L ST
Страница 1: ...Aspect L ST 40010936 1021 Installation manual ENG ENG ...
Страница 2: ...L 1 1 1 1 2 1 3 1 4 1 5 A ...
Страница 3: ...L 2 2 1 2 2 2 3 2 4 2 5 2 6 2 7 ...
Страница 4: ...L 3 3 1 3 2 3 3 ...
Страница 13: ...L 12 14 Dimentions ...
Страница 14: ...L 13 ...
Страница 15: ...14 L ...