background image

Instruction Manual for the  

Manufactured by 

E-SL 1800 Series 

Содержание Estate Slide

Страница 1: ...Instruction Manual for the Manufactured by E SL 1800 Series ...

Страница 2: ...tallation must conform to Standards EN 12453 and EN 12445 The safety level of the automated system must be C D 10 Before attempting any job on the system cut out electrical power and disconnect the batteries 11 The main power supply of the automated system must be fitted with an all pole switch with contact opening distance of 3 mm or greater Use of a 6A thermal breaker will all pole circuit break...

Страница 3: ...former coupled with control board that switches the voltage to DC to power the motor The MASTER card can be programmed and is used to set the follow ing function logics work times by self learning and pause times leaf speed and the sensitivity of the anti crushing device The locking system will automatically lock when the motor is not operating A re lease system enables the gate to be moved by han...

Страница 4: ... 2 1 Tools Needed for Installation 3 1 Manual Operation 4 1 Installation of Base Operator and Limits 5 1 5 Temporary Safety Jumpers Power 6 1 6 3 Programming 7 1 7 3 Control Board Overview 8 1 8 3 Connecting Accessories 9 1 Warranty Troubleshooting Notice 10 Table of Contents Marks pages with opener or usage warnings Although we have marked these as very important warn ings please read the entire ...

Страница 5: ...ad 500 mA Torque Nm 13 5 Gate speed 3 4 per second Operating ambient temperature 4 to 131 Deg F Operator weight lbs 19 Protection class IP 44 Gate leaf max length ft Up to 25 Gate leaf max weight lbs Up to 900 Operator overall dimensions LxHxD in See below Type of Limit Switch Magnetic Specifications 1 1 ...

Страница 6: ...e weight of the gate to be automated Dimensions and weight must match those indicated in the technical specifications Make sure the leaves move smoothly without any irregular friction during entire travel The soil must permit sufficient stability for the expansion plugs securing the foundation plate Check if the upper guide and travel limit mechanical stops are installed We advise you to have any ...

Страница 7: ...power to your operator From 0 300 16 gauge 2 conductor stranded direct burial wire will be needed From 301 600 14 gauge 2 conductor stranded direct burial wire will be needed If the gate is more than 600 from an a c power supply then an electrician will be required to move a supply closer Depending on the current base you may need cement to form a level mounting pad A voltage meter may be necessar...

Страница 8: ...4 1 Manual Operation 1 Open the protective key cover by turning the counter clock wise 2 Turn the provided key in the lock 3 Rotate the dial clockwise ...

Страница 9: ...Plate 1 Find the distance the foundation plate must be from your gate The foundation plate must be located as shown in example A right closing or example B left closing to ensure the rack and pinion mesh correctly The arrow on the plate MUST face the gate A B ...

Страница 10: ...o the bottom of the foundation plate Important check levelness of plate and measurements from gate right away before the concrete sets and the foundation plate is fixed to the pad Concrete Slab Tips Creating a wood rectangle with no top is a good way to form a slab After the cement dries the wood can be knocked away The slab must be secured to the ground below Hav ing rebar pass into the slab work...

Страница 11: ...on to the right 2 Feed any wires up through the opener while installing the opener to the base 1 Manually take the leaf to its close position 2 Lay the first piece of rack at the appropriate level and mark the hole position on the gate Make a hole and use nuts bolts and washers to make a connec tion to the gate not provided The holes in the rack are made oblong for adjust ment after the holes are ...

Страница 12: ...k installation Make sure that during the gate travel all the rack elements mesh correctly with the pinion Do not on any account weld the rack elements either to the spacers or to each other When you have finished installing the rack adjust the distance between the pinion teeth and the rack groove Check if the distance is 06 below along the entire travel using the rack slots Manually check if the g...

Страница 13: ... the magnets as seen in the picture so it is triggering the limit 3 Repeat for open position The correct positioning of the closed plate can be checked later after powering up the unit The FCC limit light above M2 terminal block will go off when the closed limit is tripped The open limit can be confirmed by the FCA limit light going off If the incorrect light is turning off the wires in FCC and FC...

Страница 14: ...e terminal strips on the control board are easily removed for wiring Simply pull straight out on the terminal strip to remove it from the board It will slide right off Slide it back on when you are finished with your wiring connections ...

Страница 15: ......

Страница 16: ...rs are only warranted if the internal fuse is not blown If the fuse is blown an outside factor shorting surge water etc has caused the transformer not to function 3 Plug the transformer into a 110 V AC outlet 4 The transformer is not weather proof and must be kept in a covered area Plug covers are available from your dealer contact 1 800 640 GATE for a dealer in your area 5 Two 12V DC batteries ma...

Страница 17: ...ovided in the control box hardware bag for jumping these terminals to common COM during the set up process It is recommended not to use any accessories until setup and programming are complete NOTE If not using safety devices the temporary safety jumper must remain in In order for the gate operator to move all three safety terminal lights STOP FSW CL FSW OP must be lit NOTE The lights will not com...

Страница 18: ...re the appropriate lights are lit 2 The display should show 3 Press and hold down P2 until the display shows parameter A with the corresponding number that is currently default or previously pro grammed 4 Press P1 to change the number variable of the parameter USE THE CHART ON THE NEXT PAGE AS A GUIDE 5 To move to the next parameter Press P2 6 When 60 seconds have elapsed without any button being ...

Страница 19: ...tput H1 H2 H3 H4 1 10 2 20 3 30 4 40 Percentage of run time in slow down I0 I1 0 Slow down speed quarter speed 1 slow down speed half speed L0 L1 0 encoder only 1 limits and encoder Encoder is a device that records number of motor turns from closed to open Recommended to use 1 setting N0 N1 0 pre flashing off 1 pre flashing on For 24V lamp terminal pre flashing is a delay that allows lamp to flash...

Страница 20: ...A and COM with a wire This will begin your gate in the CLOSING DIRECTION and the LED display will read Pr 5 When the closing limit switch is reached the motor pauses for approximately 2 seconds and then re starts with a total opening maneuver to the opening stop limit switch 6 When the full open stop or limit switch is reached the gate will stop 7 Wait for the amount of time you would like your ga...

Страница 21: ...h tripped STOP Stop command not activated Stop command activated FSW CL Closing safety device not tripped Closing safety device tripped FSW OP Opening safety device not tripped Opening safety device tripped During idle for dual gate openers all LED lights should be on If not using safety devices you must jump STOP FSW CL and FSW OP to COM in order for the gate opener to function Standard Operation...

Страница 22: ...SW CL FSW OP terminals These normally closed terminals are for safety devices during the closing CL and opening OP cycles of the gate If a safety device is not being used in this termi nal the operator must have a jumper ran from this terminal to the COM terminal in order to operate COM2 terminal This is a common or sometimes referred to as ground terminal It is used in con junction will ALL acces...

Страница 23: ...and corner of board used for power and back up power VAC terminals The input terminals for the supplied 24V transformer Polarity is not an issue for this terminal BAT BAT terminals Input terminals for the optional backup batteries The battery power com ing in must be 24V DC This can be achieved by running two 12V batteries in series During normal operation the unit keeps the batteries charged and ...

Страница 24: ...te opener to be active this cir cuit must be closed When a device opens this circuit it stops the motion of the gate operator This circuit is the main circuit for safety devices i e photo eyes safety loops etc Common abbr COM This is the matching terminal for both Normally Open and Normally Closed circuits to be connected to Accessory wiring that begins in a N O or N O terminal must have a wire th...

Страница 25: ...tal photos to the technician This is done in your best interest to save unnecessary shipping expenses and time lost Many times we can come up with solutions to issues by seeing pictures that relay information that is impossible to relay through a phone conversation Below are examples of control board pictures and motor pictures that we will be looking for Warranty Troubleshooting Notice ...