1) Dig a foundation hole as shown in fig.5.
2) Bend the foundation plate anchor bolts.
3) Ensure that the plate is walled in perfectly level as shown 

in fig.6/a-b.

4) Lay a flexible PVC tube measuring 32mm in diameter, for 

passage of the copper pipes, that reaches the hydraulic 

control unit (fig.7).

This path must feature wide range curves to avoid preventing 

passage of the hydraulic connection tubes.
As an alternative, shape the copper pipes accordingly, using a 

tube bender, and later sheath them (fig.8).
We also recommend use of a rainwater drainage tube leading 

to the closest water recovery channel.

 To correctly lay the tubes, temporarily position 

the jack protection box (fig.7/8).

5) Wait for the cement in the foundation hole to harden.
6) Place the jack on the foundation plate as shown in fig. 

6/a-b, and ensure that it is not resting on the levelling set 

screws (fig.2 - ref.7). 

 The axis of the pinion must be perfectly aligned 

with the leaf rotation axis.

 To  facilitate  jack  positioning  operations, 

a  telescopic  template  is  available  as  an 

accessory to be used as shown in fig.9.

7)  In  models  with  bearing  case,  place  the  provided  C-

brackets at the base of the jack and weld directly to the 

foundation plate as shown in fig.10.  

  Do  not  weld  the  base  of  the  jack  to  the 

foundation  plate  or  to  the  C-bracket.  ø  32 

mm  

2.3 INSTALLING THE HYDRAULIC CONTROL UNIT

Fig.11-12-13-14

1) Place the control unit box as close as possible to the jack. 

The maximum distance is 20 metres. The box can be fixed 

to a wall (fig.12) or walled in (fig.13). In both cases, use 

the provided rear plates.

2) Lay the 16 mm diameter PVC tube for passage of the 

4-pole  electrical  cable,  until  it  reaches  the  electronic 

control unit. To tighten the box, use the proper tube/box 

fittings (fig.14).

3) Perform the electrical connection to the control board 

(see corresponding instructions).

 During  installation,  it  will  be  necessary  to 

temporarily  remove  the  cover.  Be  extremely 

cautious  when  doing  this  to  avoid  damaging 

the hinges.

2.4 HYDRAULIC CONNECTION

Fig.15-16-17-18-19-20-21

The jack is connected to the control unit using copper pipes (ø 

6/8 mm) or flexible tubes (ø 4/8 mm).
Copper pipe
Before installation we recommend thoroughly cleaning the pipe 

using compressed air.

1) Protect the end of the pipe using adhesive tape.
2) Insert the copper pipe in the previously laid flexible PVC 

tube, running from the control unit to the jack.

3) Bend the copper pipe accordingly to reach, by at least a 

few centimetres, the centre of the corresponding fittings 

(fig.15-16).

The control unit fitting beside the green by-pass screw must be 

connected to the jack fitting that is within the property boundaries 

(fig.17-ref.B).
The  control  unit  fitting  beside  the  red  by-pass  screw  must 

be  connected  to  the  jack  fitting  that  is  outside  the  property 

boundaries (fig.17-ref.A).
These connections make it possible to adjust the power given 

to the gate when opening using the green by-pass screw and 

when closing using the red by-pass screw.

 Ensure that the curves are wide range to avoid 

narrowing (fig.15-16).

4) Remove the protection from the end of the pipe.
5) Cut the pipe using the proper tool.
Maximum cleanliness is required during this operation.
6)  Repeat  the  above  steps  when  preparing  the  second 

copper pipe.

7)  Connect  and  secure  the  copper  pipes  to  the  control 

unit and jack fittings using the provided hubs as shown 

in fig.18.

8) Remove and discard the control unit breather screw as 

shown in fig.19.

9) Top up the oil level using the references on the oil filler cap 

rod (fig.20). The provided FAAC HP OIL can fill a tube path 

of approximately 2 metres in length. For longer paths, to 

complete filling use only FAAC HP OIL.

Flexible tubes
To facilitate laying the hydraulic connection tube, especially for 

long paths and with many curves, use the flexible tube.
After positioning the tube and determining its length as described 

earlier, use the provided fixing fittings as shown in fig.21.

2.5 AIR BLEED OPERATIONS

Fig.17-20-22

When connecting the control unit and the jack, air will inevitably 

enter the system.
The  presence  of  air  in  the  hydraulic  system  causes  irregular 

operation of the automated system, which can be seen from 

the irregular movement of the leaf and excessive noise when 

in operation.
To avoid this inconvenience, proceed as follows:

1) command opening of the gate;
2) while the leaf is moving, temporarily remove the protective 

cap  and  loosen  the  air  bleed  screw  for  the  opening 

movement (fig.17-ref.D) as shown in fig.22;

3) release any air from the hydraulic circuit until non-emulsified 

oil appears;

4) tighten the air bleed screw before the operator completes 

the opening cycle;

5) command closing of the gate;
6) while the leaf is moving, temporarily remove the protective 

cap  and  loosen  the  air  bleed  screw  for  the  closing 

movement (fig.17-ref.C) as shown in fig.22;

7) release any air from the hydraulic circuit until non-emulsified 

oil appears;

8) tighten the air bleed screw before the operator completes 

the closing cycle.

We  recommend  to  repeat  this  operation  a  few  times  for 

each air bleed screw.

9) Top up the oil level using the references on the oil filler cap 

rod (fig.20). Top up oil using only FAAC HP OIL.

Содержание 750 Standard

Страница 1: ...750...

Страница 2: ...sur les remarques concernant les caract ristiques ou le fonctionnement du produit Vor der Installation des Produkts sind die Anweisungen vollst ndig zu lesen Mit dem Symbol sind wichtige Anmerkungen f...

Страница 3: ...Inserto Immagini Pictures Collection Collection de Figure Cojunto de Imagenes Photo Kollektion Fotoverzameling 2 1 5 4 3 200 152 175 400 124 5 6 5 7 7 6 1 2 3...

Страница 4: ...4 270 224 470 5 min 60 5 124 152 175 100 270 250 450 470 90 6 a min 60 5 124 152 175 100 270 250 450 470 90 6 b 32 mm 7 8...

Страница 5: ...min 1550 max 2840 9 10 245 6 3 5 3 65 1 4 1 5 8 0 5 11 5 12 255 3 6 2 max 65 13 30 14...

Страница 6: ...min 100 15 16 C A B D CLOSE OPEN INT EXT 17 18 19 MAX MIN 20...

Страница 7: ...1 2 21 22 min 250 23 24 a 24 b 25...

Страница 8: ...26 a 26 b 27 28 29...

Страница 9: ...on INDEX CE DECLARATION OF CONFORMITY FOR MACHINES 2 WARNINGS FOR THE INSTALLER 2 1 DESCRIPTION AND TECHNICAL SPECIFICATIONS 3 2 INSTALLING THE AUTOMATED SYSTEM 3 2 1 PRELIMINARY CHECKS 3 2 2 INSTALLI...

Страница 10: ...pecified in the Standards indicated at point 10 16 The safety devices EN 12978 standard protect any danger areas against mechanical movement Risks such as crushing dragging and shearing 17 Use of at l...

Страница 11: ...e 118 200 Max torque Nm 543 750 CBAC SB 272 750 SBS Angular speed sec 7 8 750 CBAC SB 5 2 750 SBS Amount of oil l 0 3 0 5 Protection class IP 67 Weight Kg 8 9 750 AUTOMATED SYSTEM 2 INSTALLING THE AUT...

Страница 12: ...etres the centre of the corresponding fittings fig 15 16 The control unit fitting beside the green by pass screw must be connected to the jack fitting that is within the property boundaries fig 17 ref...

Страница 13: ...e opens If the first OPEN pulse commands closing invert the phases of the electrical motor on the unit terminal board brown and black wires 3 2 SETTING OPERATION TIME Opening Closing time is determine...

Страница 14: ...nd Abbildungen in vorliegendem Handbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Ne...

Отзывы: