14 |
P a g e
Configure Before Install
Step 1
Step 2 -
Download and install the app on the end-
user’s phone.
Step 3
–
Open the front panel by removing the security screws &
Connect 24v DC
power with the power supply provided to the SURGE PCB.
Do not install the intercom. Power it up beside
the router so that you can perform the
configuration with the home
owners’ phone
beside the intercom and router.
Note: If you skip this step and proceed directly to
installation, technical support may request you
go back and perform this step before diagnosing
further.
3-4 feet / 1 metre
Search for
Praetorian Guard
and find the icon, or
scan the QR code if the phone has a QR scan app.
Note:
Be sure to accept ALL permissions during
install, otherwise you will experience problems later!
Please ensure you check the app
for updates at least once a month.
Tip:
Slight differences will be seen
between the Android and iOS app
versions, any major differences will be
highlighted in the screenshots below.
24V DC IN
(PSU
included)
To Earth
Rod!
Power
Consumption:
Standby = 96mA
Calling Out = 500mA
3 - 4 feet / 1 meter
Содержание 4402
Страница 3: ...3 P a g e PHASE 1 Site Survey...
Страница 6: ...6 P a g e PHASE 2 Product Overview...
Страница 13: ...13 P a g e PHASE 3 Setup To be done before installing the intercom...