background image

Ma y,  20 06  

4 1 5 L LS Ope ra tor  And  
4 5 5  D  C o ntrol  Pa ne l 

I ns tal la ti on Ma nua l   

CONTENTS 

T

H E

  4 1 5   L   L S   O

P E R A T O R

 

A N D

 

4 5 5   D   C

O N T R O L

  P

A N E L

:  

I

N S T A L L A T I O N

  M

A N U A L

 

FAAC International, Inc. 
303 Lexington Avenue 
Cheyenne, WY  82007 
www.faacusa.com 

Important Safety Information 

Technical Data 

Unpacking the Operator 

The 415 L LS Operator General Characteristics 

Installation Instructions 

Prepare the Gate 

Manual Release Mechanism 

Install the Operator 

Install the 455 D Control Panel         

10 

Exploded View, 415 L LS          

12 

415 L LS Parts List 

13 

 

The 455 D Control Panel  General Description 

14 

Installing the 455 D Control Panel 

14 

Connect the Main Power Supply 

14 

Connect the Operator to the Control Panel 

15 

Check the Motor’s Direction of Rotation 

15 

Connect Other Devices 

16 

Set Other Operating Controls 

18 

Programming 

20 

Learning of Operating Times 

22 

Learning of Normal Times 

22 

Learning Times with Limit Switches 

23 

Automated Systems Test 

23 

Logic Tables of 455 D Control Panel 

24 

Maintenance 

26 

Safety in Gate Design 

26 

Troubleshooting 

27 

Limited Warranty 

28 

The 455 D Cont

rol Pa

ne

In

st

al

la

ti

o

n

 I

n

st

ru

ct

ion

Содержание 415 L LS

Страница 1: ...the Operator 7 Install the 455 D Control Panel 10 Exploded View 415 L LS 12 415 L LS Parts List 13 The 455 D Control Panel General Description 14 Installing the 455 D Control Panel 14 Connect the Mai...

Страница 2: ...affected by the size of the gate how often it is used and how fast the gate operates 2 The operator you choose to install on your gate must be designed for the type and size of your gate and for the...

Страница 3: ...ower before making any attempt to repair it 4 Do not attempt to impede the movement of the gate You may injure yourself as a result 5 This equipment may reach high temperatures during operation theref...

Страница 4: ...per hour 25 Maximum leaf length ft m 15 4 5 Maximum leaf swing deg 110 Thrust and traction ft lb Nm 221 300 Stroke in cm 15 38 1 Rod speed in sec cm sec 3 4 1 85 Operating Ambient Temperature Deg F De...

Страница 5: ...panel 1 415 L LS Operator 1 4 Conductor Electric Cable for Motor Connection 1 3 Conductor Electric Cable for Limit Switch Figure 1 Parts of the 415 L LS Operator Connection 1 Package of mounting hardw...

Страница 6: ...rol Panel see page 19 for Basic Programming Reversing devices such as inductive loops and photocells should be installed to provide non contact reversing operation WARNING To insure that the installat...

Страница 7: ...he installation of the operator Follow the instructions below to install your operator whether in an inward or outward swinging configuration Installing the operator consists of the following steps At...

Страница 8: ...aking sure the dimensions on your gate system match those shown in Figure 9 Outward swinging gate If you are installing the 415 L LS Operator to swing the gate outward construct a steel elbow of suffi...

Страница 9: ...nsions 90 deg Swing 110 deg Swing A 7 5 8 in 195 mm 6 5 8 in 170 mm B 7 5 8 in 195 mm 6 5 8 in 170 mm C 50 3 4 in 1290 mm D Maximum 5 in 125 mm 4 2 5 in 110 mm E Less Than A Less Than A ATTACH THE OPE...

Страница 10: ...is manual Figure 11 Limit Switch Cover with Fastening Screw ADJUSTING THE LIMIT SWITCHES The limit switch adjustments are carried out as follows 1 Unscrew the upper fastening screw figure 11 ref A and...

Страница 11: ...e gate 6 7 8 Operator Wire Gauges for Given Voltage Control Panel Enclosure 115 VAC Photocell A 2 18 AWG A 2 18 AWG Power Switch B 4 14 AWG B 4 14 AWG FAAC 5 Wire Cable for Master Slave Connection and...

Страница 12: ...Page 12 May 2006 415 L LS Operator And 455 D Control Panel Installation Manual The 415 L LS Operator 415 L LS...

Страница 13: ...Switch Protective Cover 1 12 490108 Limit Switch Assembly 1 13 718354 Front Mounting Pin with C Clips 1 14 N A Self Tapping Screws 4 2 mm x 13 mm 7 15 728271 Front Mounting Bracket 1 16 711027 Limit S...

Страница 14: ...g the main power breaker switch and for making sure that the entire gate system meets all applicable electrical codes NOTE An installation is U L compliant only when you install the FAAC operators acc...

Страница 15: ...ire to 2 and the red wire to 3 Wire each leg of the capacitor supplied to terminals 2 3 Note If you want to delay the closing of one gate leaf in a two leaf gate design be sure to connect its operator...

Страница 16: ...leaves should open If a gate leaf closes then you need to turn off the main power and reverse the connection of the red and black wires on terminal block J4 for the operator controlling that leaf Then...

Страница 17: ...he motors without a closed circuit between 11 14 The LED Indicators The nine light emitting diodes LEDs on the control panel can be used to check for the proper function of the devices attached to the...

Страница 18: ...elay is desired it must be enabled in the Advance Programming opening and closing respectively are triggered Use the LEDs and the next table to determine if the accessory devices you have installed ar...

Страница 19: ...vac Relay Lock 12 19 NC C Coil Voltage Motor Voltage Additional Reversing Devices 17 14 9 NO C 14 If 4 Wire Receiver Free Exit Loop Phone Firebox Hold Open Dev ices 14 9 C NO 1 2 1 2 3 4 5 19 17 12 19...

Страница 20: ...am and the display resumes showing the status of the inputs The table on the right shows the sequence of functions accessible in BASIC PROGRAMMING BASIC PROGRAMMING Display Function Default OPERATING...

Страница 21: ...UNCTION If this function is enabled the safety devices operate in compli ance with French standard NFP 25 362 Y Enable No Disabled ADVANCED PROGRAMMING To access ADVANCED PROGRAMMING press the F key a...

Страница 22: ...sired motor run time has been reached an open command must be given to shut the motor off At this point gate operator 2 will automatically start to open When gate operator 2 reaches the position that...

Страница 23: ...r 1 is used you must go through the entire programming procedure as if you were programming a dual gate operating system is being installed 2 When the gate operator 1 has finished opening supply 5 ope...

Страница 24: ...g Reversing Device s Warning Light Closed Opens both leaves and closes them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Ope...

Страница 25: ...ning is in hibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer trig gered No effect On Opened Closes b...

Страница 26: ...e system Prevent such inappropriate use by installing separate gates for pedestrians The operating controls for an automatic gate must be secured to prevent the unauthorized use of those controls The...

Страница 27: ...NS BUT DOES NOT CLOSE SOLUTION Make sure you have selected the desired operating mode Verify that the reversing devices are working properly FSWOP and FSWCL should be illuminated except when a reversi...

Страница 28: ...dance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceeding those set forth in the specifications for such product s...

Отзывы: