- 5
–
Copyright © 2010, F5 Networks, Inc. All rights reserved.
ARX 1000 Chassis Replacement
Preparation - Verify Chassis is backup switch
Verify that the Field Tech has a copy of this document for reference.
Verify that the Field Tech understands that he or she will be working under your direction at all
times.
Inform the Field Tech that it is very important to work on the backup switch and not to do
anything until the backup switch has been positively identified as powering off the
active
switch will cause a service outage.
Verify the identity of the backup switch for the Field Tech
Step 1 Tag all cables
Instruct the Field Tech to label each network cable with the name of the port to which it is
connected.
Fig. 21
Step 2 Power down chassis
Instruct the Filed Tech to power downthe ARX 1000 and unplug the power cord in the back of
the unit.
Fig. 22
Содержание ARX 1000
Страница 1: ...ARX 1000 RMA4 Replacement Script March 9 2011 Version 1 02 Platform C101 ...
Страница 2: ......
Страница 4: ... 2 Copyright 2010 F5 Networks Inc All rights reserved ARX1000 Chassis Overview Front with Bezel ...
Страница 5: ... 3 Copyright 2010 F5 Networks Inc All rights reserved ARX1000 Chassis Overview Front without Bezel ...
Страница 6: ... 4 Copyright 2010 F5 Networks Inc All rights reserved ARX1000 Chassis Overview Back ...