Chapter 10
10 - 8
Adding the replacement hard drive
After you have replaced the primary hard drive with the spare hard drive,
you can add the replacement hard drive that you received from F5 Networks
to the new system.
To add the replacement hard drive
1. Ensure that the system is properly halted and shut down. For more
information, see
2. Slide the new hard drive into hard drive bay 2 (see Figure 10.3).
3. Tighten the screw into place by turning it clockwise, using an
appropriate screwdriver if necessary.
The hard drive is connected to the system when you tighten the
screw completely.
4. Power up the system by pressing the Check button on the LCD
panel.
5. Attach the front bezel to the unit by grasping the bezel on either side
using the indentations provided.
Note:
Failure to use the indentations could result in pinched
fingers.
6. Create a new spare disk, as described in
Creating a spare disk
If you are running version 10.0.1, you can use the
sparedisk
utility to create
a backup of the primary disk in your system.
Important
F5 Networks recommends that you perform the following backup procedure
when you make changes to your system, especially if you make
configuration changes. This procedure is not intended as a replacement for
a regularly-scheduled backup process. It provides a quick way to get up and
running again if your primary hard drive fails.
To create a spare disk
1. Boot the BIG-IP system into the TMOS maintenance operating
system:
a) Use a console server to log on to the system using the
root
account.
b) Type the following command:
mosreboot
Содержание 6900
Страница 1: ...Platform Guide 6900 and 8900 MAN 0297 03 ...
Страница 2: ......
Страница 5: ...Table of Contents ...
Страница 6: ......
Страница 10: ...Table of Contents viii ...
Страница 11: ...1 The 6900 8900 Platform About the 6900 8900 platform Technical support resources ...
Страница 12: ......
Страница 18: ...Chapter 1 1 6 ...
Страница 19: ...2 Installing the 6900 8900 Platform Installing and connecting the hardware ...
Страница 20: ......
Страница 31: ...3 Operating the LCD Panel Introducing the LCD panel Using the LCD panel Navigating through the LCD menus ...
Страница 32: ......
Страница 40: ......
Страница 49: ...5 Using Always On Management Introducing Always On Management Accessing the AOM Command Menu ...
Страница 50: ......
Страница 56: ......
Страница 64: ...Chapter 6 6 8 ...
Страница 65: ...7 Replacing AC Power Supplies About the AC power supply Replacing a power supply ...
Страница 66: ......
Страница 70: ...Chapter 7 7 4 ...
Страница 71: ...8 Replacing DC Power Supplies About the DC power supply Guidelines for DC powered equipment ...
Страница 72: ......
Страница 81: ...9 Replacing the Fan Tray About the fan tray Replacing the fan tray ...
Страница 82: ......
Страница 86: ......
Страница 96: ...Chapter 10 10 10 ...
Страница 97: ...11 Working with Environmental Guidelines for the 6900 8900 Platform Environmental requirements ...
Страница 98: ......
Страница 100: ...Chapter 11 11 2 ...
Страница 101: ...12 Understanding Platform Airflow Reviewing platform airflow information ...
Страница 102: ......
Страница 104: ...Chapter 12 12 2 ...
Страница 106: ......
Страница 113: ...A Platform Specific Hazardous Substance Levels for China 6900 platform 8900 platform ...
Страница 114: ......
Страница 117: ...Glossary ...
Страница 118: ......
Страница 121: ...Index ...
Страница 122: ......