background image

× 

288

4

×

50

19/24

87

%

SCREW THE 

FLOORBOARDS 

INTO 

FOUNDATION, SAW THE 

LAST 

BOARD 

TO MAKE IT FIT.

FB

Содержание VICTORIA C 40

Страница 1: ...60 15 850 110 40 5 70 4 50 6 140 1 4X40 M8 70 3 mm 4 mm 5 mm 8 mm 65 4 40 1 24 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS VICTORIA C 40...

Страница 2: ...THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C D B AB CD 0...

Страница 3: ...2 10 5 70 6 140 4 mm 5 mm 3 24 ATTACH FOUNDATION BEAMS WITH SCREWS 4 6 140 5 70...

Страница 4: ...4 24 LAY OUT THE BOTTOM LOGS SO THAT DOOR OPENING WILL BE 1441 MM WIDE 5 2 LG 1 1 LG 1 A BL 1 B BL 1 1441 mm...

Страница 5: ...6 12 5 70 6 140 4 mm 5 mm 5 24 ATTACH LOGS TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 6 6 140 5 70 5mm...

Страница 6: ...3 5 70 4 mm 6 6 140 5 mm 6 24 7 ATTACH THE NEXT ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 6 140 5 70 A LG 1 B LG 2...

Страница 7: ...7 24 9 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK 1 LG 6...

Страница 8: ...8 24 10 SLIDE THE DOOR IN ATTACH THE HANDLE CDD6R 3 LOGS IN PLACE...

Страница 9: ...9 24 22 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK 1 LG 3 1 LG 2 B LG 4 B LG 1...

Страница 10: ...10 24 SLIDE THE WINDOWS IN ATTACH THE HANDLE 23 CDW2L CDW2R...

Страница 11: ...11 24 46 2 LG 2 B LG 6 16 LOGS AND 1 HALF LOG IN PLACE B LG 3 1 LG 5 1 LG 7 1 LG 4...

Страница 12: ...INSTALL CEILING TRIANGLE AND ATTACH WITH SCREWS INTO THE WALLS LEAVE 4CM CAP BETWEEN DOOR AND CEILING DETAIL ATTACH IT INTO WALLS AND INTO CEILING TRIANGLE USING SCREWS 47 CEILING DETAIL 40 120 CEILIN...

Страница 13: ...40 6 140 5 mm 13 24 52 ATTACH TOP LOGS INTO WALL LOGS WITH SCREWS B TL 2 2 TL 3 2 TL 1 2 TL 2 A TL 3 A TL 1 A TL 2 A TL 4 1 TL 3 1 TL 1 1 TL 2 B TL 1 B TL 3 B TL 4...

Страница 14: ...14 24 53 CONNECT THE ROOF PURLINS RFR WITH RD BEFORE INSTALLING THEM ON TOP OF THE CORNERS RD RFR...

Страница 15: ...4 6 140 5 mm 15 24 55 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS...

Страница 16: ...16 5 70 4 mm 16 6 140 5 mm 16 24 58 INSTALL THE ROOF PURLINS RFB AND ATTACH THEM WITH SCREWS RFB2 RFB4 RFB1 RFB3 5 70 6 140...

Страница 17: ...408 4 50 17 24 62 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH SCREWS RB21...

Страница 18: ...ROOF TOP 40 4 40 18 24 86 INSTALL THE ROOF TOP AND ATTACH IT WITH SCREWS ATTACH FASCIA TRIMS INTO ROOFPURLINS RF...

Страница 19: ...288 4 50 19 24 87 SCREW THE FLOORBOARDS INTO FOUNDATION SAW THE LAST BOARD TO MAKE IT FIT FB...

Страница 20: ...40 1 4x40 20 24 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Страница 21: ...4CM 20CM 15 M8 70 8 mm 21 24 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 97 WINDBOARD...

Страница 22: ...90 90 22 24 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90 98...

Страница 23: ...23 24 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Страница 24: ...24 24 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Отзывы: