![EZ Digital FG-7005C Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/ez-digital/fg-7005c/fg-7005c_operation-manual_2457870008.webp)
2. INSTALLATION
2-1. Initial Inspection
This instrument was carefully inspected both mechanically and electrically before
shipment. It should be physically free of damage. To confirm this, the instrument
should be inspected for physical damage in transit. Also, check for supplied
accessories.
2-2. Connecting AC Power
This instrument requires AC 230V/115V,50-60Hz power through 3-conductor ac
power cable to be fit into three-contact electrical outlet to secure grounding.
If forced to use 2-conductor cable, use ground terminal in rear panel for grounding
instrument.
CAUTION
THIS INSTRUMENT IS SET TO AC 230V. BEFORE POWERING ON THIS
INSTRUMENT, MAKE SURE THE VOLTAGE OF THE POWER SOURCE IS AC
230V. IN CASE OF AC115V, SWITCH SHOULD BE SELECTED DOWN TO 115V
POSITION.
2-3. Cooling And Ventilation
No special cooling and ventilation is required. However, the instrument should be
operated where the ambient temperature is maintained.
2-4. Position
This instrument is built as a bench-type instrument with rubber feet and tilt stand in
place. Stand-up angle can be adjusted by rotating angle of carrying handle.
2-5. WARMING-UP
Allow more than 20 minutes for the unit to warm up so that it is stabilized and ready
for use.