™
Walk In Tub
Installation and Operating Instructions
®
www.ezable.com
877-392-2531
Thank you for purchasing the SerenityNow
Walk-In Tub. For best results, please read and
follow all directions carefully.
PRE-INSTALLATION PLANNING
1.
Care and Testing
a.
Do not store the Walk In tub outside and be
sure to keep out of sunlight and exposure to
weather.
b.
Never lift the tub by the piping. Lift only by the
tub main deck.
Inspect the tub for damage or shortage. Verify
that the tub specifications are correct. If damage
or shortage has occurred notify the distributor or
freight carrier immediately.
c.
All our Walk In tubs are factory tested for
leaks and general operation. Because of handling
and shipping, we recommend that you also
perform a similar test prior to installation: Plug
drain with duct tape and fill with water. Have the
electrician make a temporary, safe, grounded
G.F.C.I. protected connection. Press the on/off
button and check for leaks at all pipe connections.
d.
If any leaks or controls fail to operate
properly,do not proceed with installation.
Immediately call 877.392.2531 and ask for the
Warranty Department.
2.
Determine Your Tub Size
a.
If you are replacing a 60” tub with a new
SerenityNow Walk In tub, a color coordinated tub
extension kit is available to fill the area and create
a decorative ledge
See Figure 1
.
b.
If you plan to finish the area with tile, install
green board or its equivalent and tile the area.
Plan the framing to match the size of the tiles.
See Figure 7
in this manual for more details.
3.
Whirlpool Installation Planning
If your SerenityNow Walk In tub is a whirlpool, the suction
line will exceed the overall depth of the unit which
means the back flange will not fit against the stud
wall. Build out a frame ledge away from the studs
approximately 3”.
See Figure 1B
NOTE:
Before installation, adjust tub levelers
for proper height. Space from floor to bottom
edge of tub rim must be 36- 3/4”to provide
clearance for front cover panel installation.
Take care to test fit all the cover panels for fit
prior to moving the tub into the installation
location. Adjust levelers if necessary. See
Figure 3
for more details.
4.
New Installations
For new installations, placement in the room is
Tools you might need for proper installation
•
6 D Galvanized Nails or Screws
•
Large Level
•
Hammer or Screw Gun
•
Carpenter’s Square
•
Adhesive
•
Small Wrench
•
Tape Measure
60”
50”
Use Extension Kit or other
finishing materials to cover
this area.
FIGURE 1
SerenityNow
Page 1 of 9
Содержание SerenityNow
Страница 2: ......