VTT001 and VTR001 • Installation
3.
Mechanical loading
— Mount the equipment in the rack
so that a hazardous condition is not achieved due to
uneven mechanical loading.
4.
Circuit overloading
— Connect the equipment to the
supply circuit and consider the effect that circuit
overloading might have on overcurrent protection and
supply wiring. Appropriate consideration of equipment
nameplate ratings should be used when addressing this
concern.
5.
Reliable earthing (grounding)
— Maintain reliable
grounding of rack-mounted equipment. Pay particular
attention to supply connections other than direct
connections to the branch circuit (e.g. use of power strips).
Rack mounting
Various 1U rack space frames accommodate the VTT001 MAAP,
VTT001 AAP, VTR001 MAAP, and VTR001 AAP modules. The
CPM133 is a one-third rack width frame that can be mounted to
the IN9080 rack mount shelf. The CPM112R, shown in figure 2-
11, is a full rack width frame that holds six double sized
modules.
Depending on the A/V connector frame used, the transmitters/
receivers may be mounted to the rack with or without the rack
mount shelf.
1.
For mounting without a rack mount shelf, mount the
transmitter/receiver module(s) to the A/V connector
frame, then attach the frame directly to the rack. See
figure 2-11.
2-15
Содержание Twisted Pair Receiver VTR001
Страница 1: ...User s Manual Twisted Pair Transmitter and Receiver 68 760 01 Rev G 06 09 VTT001 and VTR001 ...
Страница 4: ...Precautions cont d ...
Страница 8: ...VTT001 and VTR001 Table of Contents Table of Contents cont d ii ...
Страница 9: ...VTT001 VTR001 1 Chapter One Introduction Features ...
Страница 12: ...VTT001 and VTR001 Introduction Introduction cont d 1 4 ...
Страница 31: ...VTT001 VTR001 A Appendix Reference Information Specifications Parts List ...
Страница 37: ...VTT001 and VTR001 Reference Information A 7 ...
Страница 38: ...VTT001 and VTR001 Reference Information Reference Information cont d A 8 ...