background image

Using a UL-Certified Junction Box

1. 

Locate a wall stud and mark the position where the junction 
box will be placed. Use the size specifications provided by the 
manufacturer.

2. 

Cut a hole in the wall. To avoid making the hole too big, cut 
inside the lines you marked in step 1.

3. 

Test the fit by inserting the junction box into the hole in the 
wall. If necessary, use a rasp or file to enlarge the hole.

4. 

Insert the junction box into the hole in the wall. Secure it to the 
stud using two screws or nails, as appropriate. The front edge of 
the junction box must be flush with the front surface of the wall.

5. 

Secure the wall adapter (provided) to the junction box, using the 
four screws (provided).

6. 

Connect a network switch to the "LAN In" port of the PoE 
power supply (provided). Run a second cable from the "Pwr LAN 
Out" port to the TLP 350MV mounting site (see the figure on the 
previous page).

7. 

Run video cables to the mounting site. Leave enough slack in the cables 
to connect them to the TLP 350MV. Pull the cables through the mud ring.

8. 

Connect the cables as shown in the diagram at the bottom of the previous page.

9. 

Secure the TLP 350MV to the wall adapter. Two clips at the top and two at the bottom 
audibly click when the panel moves into place. You should also use the two screws provided (top center and bottom 
center).

10. 

Do not replace the bezel at this time. You will need access to recessed the Menu and Reset buttons to configure the 
unit.

Configuring the TLP 350MV (Initial Setup)

Before use, the TLP 350MV must be configured using the on-screen menus. There are five different screens (Main, Vol, Time, 
IP, and Vid) that can be selected by pressing the appropriate button at the edge of the Main screen. There is also an 

Exit

 

button at the bottom left corner of the screen for leaving the menus.

NOTE:

  Only the Main screen provides links to the VolTimeIP, and Vid screens. All other screens have a link to return to 

the Main screen. After calibrating each group of settings, return to the Main screen to access the next screen.

Setup Menu

1. 

Press the recessed Menu button on the front panel to activate the 
top-level menu screen. The menu opens at the Main Setup Page.

2. 

Touch an area of the screen to bring it into focus and use the Up and 
Down buttons or the volume control knob to adjust the value. Some 
options have a single button and toggle between Off and On when 
the button is pressed.

Use the different menu pages to adjust the following options. For more 
details, see the user guide.
Main  (shown at right) — Shows Power over Ethernet status and adjusts 
the Sleep timer, Backlight, Auto Backlight, and LED Backlight functions.
Vol — Adjusts the Master, Click (global button sounds), and Sounds 
(playback .wav files) volume settings.
Time — Sets the correct time and date.
IP — Sets the IP address and the subnet mask, and enables or disables Dynamic Host Configuration Protocol.
Vid — Provides a small video preview window and the controls to calibrate video contrast, color, brightness, and tint.

Main

Vol

Time

IP

Exit

Dn

Up

Dn

On

On

Up

On

Sleep:  00000 Sec

Backlight:  075%

Auto

Vid

LED Motion

Backlight

PoE

Active

Wall Stud

Junction Box

Wall Adapter

TLP 350MV

Bezel

PC

LA

PT

OP

DV

D

DO

C C

AM

AU

XIL

IAR

Y

DIS

PLA

Y O

N

DIS

PLA

Y O

FF

MU

TE

5

9

4

Screws (2)

Содержание TLP 350MV

Страница 1: ...o Show Recessed Buttons right a Light sensor monitors the level of ambient light and adjusts the screen brightness and button backlighting b 3 5 inch LCD screen provides a graphical user interface with a pressable touch screen display c Speaker provides audible feedback d Motion detector detects movement in front of the panel When no motion has been detected for a user defined period of time the u...

Страница 2: ...ower over Ethernet PoE power supply Connect a network switch to the LAN In port and run a second cable from the Pwr LAN Out port to the Touch Panel mounting site see the figure below CAUTION Whether you use a PoE power supply or a 12 VDC power supply not provided you must read the caution in the Power Supply section of the TLP 350MV User Guide NOTE If both a PoE power supply and a 12 VDC power sup...

Страница 3: ... be configured using the on screen menus There are five different screens Main Vol Time IP and Vid that can be selected by pressing the appropriate button at the edge of the Main screen There is also an Exit button at the bottom left corner of the screen for leaving the menus NOTE Only the Main screen provides links to the Vol Time IP and Vid screens All other screens have a link to return to the ...

Страница 4: ...aults for everything except firmware NOTE Refer the TLP 350MV User Guide available at www extron com for additional details Designing and Configuring the TLP 350MV Interface Producing the graphical user interface GUI for the TLP 350MV requires two steps You must first design the layout using the Extron GUI Configurator software This allows you to design buttons icons text and other objects and org...

Отзывы: